Laserfiche WebLink
v The Project Sponsor will be responsible for the construction of a four -lane Stoneridge Drive that will connect the extension of Stoneridge Drive from its eastern <br />terminus to E1 Charro Road, including a second two-lane Arroyo Mocho bridge (with bike lanes and sidewalks) and all mitigation measures related to that <br />connection. <br />vi The City of Pleasanton shall be responsible for the biological -related notification, consultation, mitigation, and monitoring required for construction to occur at <br />the Community Park site as'required by any of the -,environmental permitting agencies (USFWS, CDFG, US Army Corps of Engineers, and SFRWQCB), unless <br />prior to the transfer of the Community,Park site to the City of Pleasanton an agreement regarding responsibility, acceptable to both the City of Pleasanton and the <br />Project Sponsor, is reached. <br />54 <br />