Laserfiche WebLink
Road Construction Emissions Model, Version 7.1.5.1 <br />Emission Estimates for -> City of Pleasanton - Recycled Water Project - Ken Mercer Sports I Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust <br />Project Phases (English Units) ROG (Ibslday) CO (Ibslday) NOx (lbs/day) PM10 (Ibslday) PM10 (lbs/day) PM10 (Ibslday) PM2.5 (lbs/day) PM2.5 (Ibslday) PM2.5 (Ibslday) CO2 (Ibslday) <br />Grubbing/Land Clearing 0.3 2.9 3.8 0.2 0.2- 0.2 0.2 - 735.7 <br />Grading/Excavation 1.2 6.4 12.1 0.6 0.6- 0.6 0.6 - 1,403.1 <br />Drainage/Utilities/Sub-Grade 0.0 0.1 0.6 0.0 0.0- 0.0 0.0 - 162.9 <br />Paving - - - - - - - - - - <br />Maximum (pounds/day) 1.2 6.4 12.1 0.6 0.6 - 0.6 0.6 - 1,403.1 <br />Total (tons/construction project) 0.0 0.0 0.0 0. <br />0.0 0.0 - 0 0.0 - 2.5, <br />Notes: Project Start Year-> 2018 <br />Project Length (months) -> 2 <br />Total Project Area (acres) -> 0 <br />Maximum Area Disturbed/Day (acres) -> 0 <br />Total Soil Imported/Exported (yd'/day)-> 0 <br />PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. <br />Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns H and I. Total PM2.5 emissions shown in Column J are the sum of exhaust and fugitive dust emissions shown in columns K and L. <br />Emission Estimates for -> City of Pleasanton - Recycled Water Project - Ken Mercer Sports I Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust <br />Project Phases (Metric Units) ROG (kgslday) CO (kgalday) NOx (kgslday) PM10 (kgs/day) PM10 (kgs/day) PM10 (kgslday) PM2.5 (kgs/day) PM2.5 (kgslday) PM2.5 (kgs/day) CO2 (kgslday) <br />Grubbing/Land Clearing 0.2 1.3 1.7 0.1 0.10.1 0.1 334.4 <br />Grading/Excavation 0.5 2.9 5.5 0.3 0.3- 0.3 0.3 - 637.8 <br />Drainage/Utilities/Sub-Grade 0.0 0.1 0.3 0.0 0.0- 0.0 0.0 - 74.0 <br />Paving - - - - - - - - - - <br />Maximum (kilograms/day) 0.5 2.9 5.5 0.3 0.3 - 0.3 0.3 - 637.8 <br />Total (megagrams/construction project) 0.0 0.0 0.0 0.0 0.0 - 0.0 0.0 - 2.3, <br />Notes: Project Start Year -> 2018 <br />Project Length (months) -> 2 <br />Total Project Area (hectares) -> 0 <br />Maximum Area Disturbed/Day (hectares) -> 0 <br />Total Soil Imported/Exported (meters'/day)-> 0 <br />PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. <br />Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns H and I. Total PM2.5 emissions shown in Column J are the sume of exhaust and fugitive dust emissions shown in columns K and L. <br />