Laserfiche WebLink
The proposed tie in location is within a fenced utility enclosure adjacent to a paved maintenance <br />yard. The tie-in location is graded, graveled and lacks groundcover vegetation. <br />Photo 3: Tie-in Location <br />The Pleasanton Canal (a flood control channel) is located to the south of the tie-in location; the <br />channel is separated from the tie-in location by a fence. The Pleasanton Canal flows into the <br />Arroyo de la Laguna, which eventually joins San Ramon Creek. The channel is confined to a <br />constructed trapezoidal flood control channel. At the time of the site visit (which followed a <br />period of heavy rain) there were pockets of standing water, but much of the channel was dry <br />and/or choked with vegetation such as tules (Schoenoplectus sp.) and curly dock (Rumex <br />crispus). Both channel banks are dominated by a dense growth of ruderal plant species and non- <br />native grasses, including species such as wild oats (Avena sp.) and poison hemlock (Conium <br />maculatum). There is no riparian vegetation along the channel, and the channel is outside of the <br />project's disturbance area. <br />5 <br />