My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
051518
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 5:42:37 PM
Creation date
5/10/2018 9:54:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/15/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed tie in location is within a fenced utility enclosure adjacent to a paved maintenance <br />yard. The tie-in location is graded, graveled and lacks groundcover vegetation. <br />Photo 3: Tie-in Location <br />The Pleasanton Canal (a flood control channel) is located to the south of the tie-in location; the <br />channel is separated from the tie-in location by a fence. The Pleasanton Canal flows into the <br />Arroyo de la Laguna, which eventually joins San Ramon Creek. The channel is confined to a <br />constructed trapezoidal flood control channel. At the time of the site visit (which followed a <br />period of heavy rain) there were pockets of standing water, but much of the channel was dry <br />and/or choked with vegetation such as tules (Schoenoplectus sp.) and curly dock (Rumex <br />crispus). Both channel banks are dominated by a dense growth of ruderal plant species and non- <br />native grasses, including species such as wild oats (Avena sp.) and poison hemlock (Conium <br />maculatum). There is no riparian vegetation along the channel, and the channel is outside of the <br />project's disturbance area. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.