Laserfiche WebLink
N mf_",; I: Al <br />L�' <br />CONSU�.TIEE <br />NG,:INC ,.. <br />c) One additional load center — pictured below is located on the second <br />floor serving receptacle and lighting loads only. Sub panel breaker is <br />exposed, with no cover plate. <br />Electrical Sub Panel(s) <br />2. Recommended Correction: <br />a) The PG&E meter assembly and service entry appears to be in <br />serviceable condition. The vegetation in front should be cleared for <br />proper access. <br />b) For new commercial use, it is recommended to upgrade the service and <br />_main circuit breaker assembly. 200A (amp) single phase service <br />minimum. <br />1. Cost to upgrade the electrical panel/meter assembly (not <br />including planning or -PG&E costs): $3.000.00. <br />c) The load center should -be replaced with'a new 24 circuit panel board. <br />New/Existing circuits should be reconnected to new panel board with <br />updated panel circuit directory. . <br />1. Cost to upgrade the electrical panel with new 24 circuit panel <br />board and circuit breakers: $2,000:00. <br />D. Electrical Branch Circuits:. <br />9.1.50:`CH S=A'I'EAK:E DRIVE SE, 21;1c-:%SAN.O;IEG�,:C(4�92` <br />OFFtGE t6'.i9D 5:5 , 10135:' WW.W EIENCDNS.ULTING.:GO.M:' <br />