Laserfiche WebLink
2 STOP ELEVATOR <br />1 <br />LS <br />$100,000.00 <br />$100,000.00 <br />SYSTEM TOTAL <br />$100;000:00 <br />01200 SITEWORK <br />EXPANDED PARKING <br />MODIFCATIONS TO GAZEBO AND SITE PATHWAYS <br />MISC SITE IMPOROVEMENTS <br />1 <br />1 <br />1 <br />LS <br />LS <br />LS <br />$150,000.00 <br />$25,000.00 <br />$25,000.00 <br />$150,000.00 <br />$25,000.00 <br />$25,000.00 <br />SYSTEM TOTAL <br />$200;000:001 <br />CALCULATION OF % MARK-UP <br />DIVISION 1, GENERAL REQUIREMENTS <br />GENERAL CONTRACTOR'S OH & P <br />DESIGN DEVELOPMENT CONTINGENCY <br />ESCALATION CONTINGENCY <br />"BOTTOM LINE" TOTAL <br />15.00% <br />12.00% <br />20.00% <br />6.00% <br />53.00% <br />$850,650.00 <br />CONSTRUCTION CONTINGENCY <br />10.00% <br />$245,565.00 <br />ESTIMATE ASSUMES WORK IS COMPLETED DURING NORMAL BUSINESS HOURS. <br />DESIGN FEES 1 LS $175,000.00 <br />FFE - 1 LS $65,000.00 <br />CITY ADMINISTRATIVE COSTS 4.00% $108,048.60 <br />PERMITS AND SPECIALINSPECTIONS 1 LS $50,000.00 <br />ADDITIONAL PROJECT COSTS $398,048.60 <br />OiF O _ G081TIN059 09 z 3TG0 <br />