Laserfiche WebLink
01100 <br />2 STOP ELEVATOR <br />1 <br />LS <br />$100,000.00 <br />$100,000.00 <br />$100,000.001 <br />`.SYSTEM TOTAL = " <br />01200 SITEWORK <br />EXPANDED PARKING <br />1 <br />LS <br />$150,000.00 <br />$150,000.00 <br />EXTERIOR RESTROOM BUILDING <br />1 <br />LS <br />$125,000.00 <br />$125,000.00 <br />MODIFCATIONS TO GAZEBO AND SITE PATHWAYS <br />1 <br />LS <br />$25,000.00 <br />$25,000.00 <br />MISC SITE IMPOROVEMENTS <br />1 <br />LS <br />$40,000.00 <br />$40,000.00 <br />$340,000:001 <br />SYSTEM TOTAL <br />U COS1TiR <br />Sit a3E QO <br />CALCULATION OF % MARK-UP . <br />DIVISION 1, GENERAL REQUIREMENTS <br />15.00% <br />GENERAL CONTRACTOR'S OH & P <br />12.00%. <br />DESIGN DEVELOPMENT CONTINGENCY <br />20.00% <br />ESCALATION CONTINGENCY <br />6:00% <br />"BOTTOM LINE" TOTAL <br />53.00% <br />$974,140.00 <br />CONSTRUCTION CONTINGENCY <br />10.00% <br />$281,214.00 <br />T093�{T00 <br />Oi UL,EC�TlC ; ; GsOS <br />ESTIMATE ASSUMES WORK IS COMPLETED DURING NORMAL BUSINESS HOURS. <br />DESIGN FEES <br />1 <br />LS <br />$225,000.00 <br />FFE <br />1 <br />LS <br />$65,000.00 <br />CITY ADMINISTRATIVE COSTS <br />4.00% <br />$123,734.16 <br />PERMITS AND SPECIAL INSPECTIONS <br />1 <br />LS <br />$50,000.00 <br />ADDITIONAL PROJECT COSTS $463,734.16 <br />�TiO►L�P.OLGiT�CO _ ; �0�871L6 <br />