My WebLink
|
Help
|
About
|
Sign Out
PC-2019-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 12:59:57 PM
Creation date
9/26/2019 11:37:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/26/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-16
NOTES
DSP_CERTIFY FEIR FOR DSP UPDATE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program for the City of Pleasanton Downtown Specific Plan <br />1 <br />1 Purpose <br />State of California Public Resources Code Section 21081.6(a)(1) requires a lead or responsible <br />agency that approves or carries out a project where an Environmental Impact Report (EIR) has <br />identified significant environmental effects to adopt a reporting or monitoring program for the <br />changes made to the project or conditions of project approval, adopted in order to mitigate or avoid <br />significant effects on the environment. The City of Pleasanton (the "City") is the lead agency for the <br />EIR prepared for the City of Pleasanton Downtown Specific Plan (SCH No. 2001032014), hereafter <br />referred to as “Proposed Plan,” and therefore is responsible for the adoption and implementation <br />of the required mitigation monitoring and reporting program. An EIR has been prepared for the <br />Proposed Plan that addresses potential environmental impacts and, where appropriate, <br />recommends measures to mitigate these impacts. <br />The Mitigation Monitoring and Reporting Program (MMRP) has been prepared in conformance <br />with Public Resources Code Section 21081.6(a)(1). It is the intent of this program to: <br />1.Verify satisfaction of the required mitigation measures of the EIR; <br />2.Provide a methodology to document implementation of the required mitigation; <br />3.Provide a record of the monitoring program; <br />4.Identify monitoring responsibility; <br />5.Establish administrative procedures for the clearance of mitigation measures; <br />6.Establish the frequency and duration of monitoring; and <br />7.Utilize existing review processes wherever feasible. <br />The MMRP describes the procedures that will be used to implement the mitigation measures <br />adopted in connection with the approval of the Proposed Plan and the methods of monitoring such <br />actions. A monitoring program is necessary only for impacts which would be significant if not <br />mitigated. <br />If, during the course of project implementation, any of the mitigation measures identified cannot <br />be successfully implemented, the City shall immediately inform any affected responsible agencies. <br />The City, in conjunction with any affected responsible agencies, will then determine if modification <br />to the project is required, and/or whether alternative mitigation is appropriate. <br />The following consists of a monitoring program table noting the responsible entity for mitigation <br />monitoring, the timing, and a list of all project-related mitigation measures.
The URL can be used to link to this page
Your browser does not support the video tag.