Laserfiche WebLink
Mitigation Monitoring and Reporting Program for the City of Pleasanton Downtown Specific Plan <br />8 <br /> <br />Impact Mitigation Measure Method of Verification Timing of <br />Verification <br />Responsibility for <br />Verification <br />Verification Complete <br />Date Initial <br />energy efficient than the current <br />Building and Energy Efficiency <br />Standards; <br />• Provide a 15-percent offset in <br />building envelope energy use <br />through use of renewable energy <br />(e.g. photovoltaic, wind); <br />• Provide a combination of energy <br />reductions and renewable energy <br />offsets to meet the overall 15- <br />percent reduction in building energy <br />use <br />The 15-percent reduction in building <br />envelope energy use shall be based on <br />the current Building and Energy <br />Efficiency Standards (Title 24, Part 6, of <br />the California Building Code) that is in <br />place at the time building permits are <br />submitted to the City. Architectural <br />plans submitted to the City Building <br />Division shall identify the requirement <br />to reduce building energy use by 15 <br />percent and/or provide renewable <br />energy to meet this requirement. <br />c) Require applicants for non-residential <br />projects that employ 20 of more <br />people—which is equivalent to 12,000 <br />square feet of retail space, 6,000 square <br />feet of office space, 20,000 square feet <br />of industrial space, or 22 hotel rooms to <br />implement an employee commute trip <br />reduction (CTR) program. The CTR <br />program shall identify alternative modes <br />of transportation to the project,