My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
020420
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:28:08 PM
Creation date
1/28/2020 4:28:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
15Y
Document Relationships
11 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENT 5A
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENTS 6-9
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.E-1.Biological Resources <br /> (2012 SEIR)Modified Mitigation Measure 4.0-1a: Pre- 4-4 Site developer shall Site developer -T Review and approve a qualified No more than 14 Verified by: <br /> construction Breeding Bird Surveys.The City shall ensure that 6 11, 13, 14, prepare construction Community biologist. days before start Date: <br /> prior to development of all potential sites for rezoning(Sites 1 4,6 16 21 plans that incorporate Development Review pre-construction survey or restart of <br /> 11, 13, 14,and 16 21)and each phase of project activities that have All(Phase I pre-construction surveys Department reports. construction <br /> the potential to result in impacts on breeding birds(e.g.,tree removal and Full and buffer zones.If during the months <br /> If active nests are found, <br /> or demolition of buildings or bridges),the project applicant shall take Buildout) required,avoidance � of February <br /> the following steps to avoid direct losses of nests,eggs,and nestlings procedures shall be inspect construction site to through August. <br /> and indirect impacts to avian breeding success: implemented. confirm buffer zones. <br /> • If grading or construction activities occur only during the non- Site developer shall hire <br /> breeding season,between August 31 and February 1,no surveys a qualified biologist and <br /> will be required. the site developer's <br /> • Pruning and removal of trees and other landscaped vegetation, contractor(s)shall <br /> including grading of grasslands,should occur whenever feasible, engage the qualified <br /> outside the breeding season(February 1 through August 31). biologist to conduct pre- <br /> During the breeding bird season(February 1 through August 31) descsurveys as <br /> • a qualified biologist will survey project sites for nesting raptors descrrribbetion ed. <br /> and passerine birds not more than 14 days prior to any ground- <br /> disturbing activity or vegetation removal.Surveys will include all <br /> line-of-sight trees within 500 feet(for raptors)and all vegetation <br /> within 250 feet for all other species. <br /> • Based on the results of the surveys,avoidance procedures will be <br /> adopted, if necessary,on a case-by-case basis.These may <br /> include construction buffer areas(up to several hundred feet in <br /> the case of raptors)or seasonal avoidance. <br /> • Bird nests initiated during construction are presumed to be <br /> unaffected by project activities,and no buffer would be necessary <br /> except to avoid direct destruction of a nest or mortality of <br /> nestlings. <br /> • If pre-construction surveys indicate that nests are inactive or <br /> potential habitat is unoccupied during the construction period, no <br /> further mitigation is required if work is initiated within 14 days of <br /> the survey.Trees and shrubs that have been determined to be <br /> unoccupied by nesting or other special-status birds may be <br /> pruned or removed within 14 days of the pre-construction survey. <br /> Should activities be delayed beyond 14 days, pre-construction <br /> surveys shall be repeated prior to the start of work. <br /> Johnson Drive Economic Development Zone 5-1 1 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.