Laserfiche WebLink
Commissioner Pace discussed Lots 1 and 5 maintaining the rural feel and look. He asked the <br /> size of the lots and homes west of the property and referenced the size of the lots and homes <br /> near the proposed project. He then referenced the acreage between Lots 1 and 5 and <br /> discussed the applicant's willingness to move the lot line to create more or less a one-acre lot <br /> for Lot 1 but noted its impact on the creek. <br /> Ms. Clark responded that the lot was .99 acres and the home was about 5,000 square feet. <br /> She clarified that the lots on the south side of the street were within the County, not the City's <br /> jurisdiction, therefore, they were not developed under the City's zoning requirements. She then <br /> responded that the position of the lot line would not impact the location of the building <br /> envelope. <br /> Commissioner Pace referenced the architectural design and Commissioner Allen's discussion <br /> of the size and view of the home; he asked about restrictions on the size of the home. He then <br /> requested clarification on landscaping guidelines. <br /> Ms. Clark stated the design guidelines adopted with the PUD would restrict size and massing <br /> of the homes on Lots 1 and 5. She explained the landscaping guidelines on Lots 1 and 5 and <br /> informal plantings requirement, with the landscaping subject to design review with the <br /> development of the site. <br /> Commissioner Pace asked if the homes to the west were designated as agriculture. <br /> Ms. Soo confirmed that they were designated PUD-A (agriculture). <br /> Commissioner Pace confirmed that the look and feel of the lot would be consistent with the <br /> neighborhood. <br /> Vice Chair Brown interjected that the nearby houses were large and not set back from the road <br /> due to the creek. He stated the proposed visual representation was more positive than the <br /> existing properties to the west. <br /> Commissioner Allen asked the worst-case mass and square footage on Lot 1 . <br /> Ms. Clark explained the maximum building area for all enclosed structures could not exceed <br /> 7,500 square feet, but the Planning Commission could choose to reduce the overall massing <br /> size of the home. In response to Commissioner Pace, Ms. Clark pointed out the exhibit <br /> depicting design guidelines and standards for review. <br /> Commissioner Allen asked about the setback from Dale Road. Staff displayed the site plan <br /> provided during the applicant's presentation. She then asked and confirmed that the distance <br /> was 25 feet from Dale Way. <br /> Commissioner Pace inquired how many residences could be built on the site and what <br /> constituted the residence. <br /> Ms. Clark explained that one single family home plus an Accessory Dwelling Unit (ADU) was <br /> allowed; she explained the allowance for ADUs. <br /> Excerpt: Planning Commission Minutes, January 22, 2020 Page 4 of 7 <br />l development,' NSSP, page 75. She pointed out the <br /> proposed agricultural lots. She referenced the visuals of the lots and clarified that the family <br /> was asking for an update to the NSSP to allow for the proposed development. She continued <br /> by referencing Senate Bill 50, passed on January 6, 2020, regarding housing projects and the <br /> state providing housing to all income levels. She referenced a visual simulation to demonstrate <br /> the size of the lots and discussed support from the neighbors. <br /> Laverne Spotorno, resident of Pleasanton and family within the City for over 250 years, <br /> provided support for the project and encouraged the Commission to approve the plan, with <br /> whatever conditions may be set forth. <br /> Excerpt: Planning Commission Minutes, January 22, 2020 Page 1 of 7 <br />ed to review of its consistency with the approved PUD development plan <br /> and compliance with State-mandated findings. As noted earlier, staff does not support the <br /> proposed five-lot residential development, and thus does not support the Vesting Tentative <br /> Map as proposed. However, should the Planning Commission support a version of the PUD <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 21 of 23 <br /> review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />