My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 11:00:08 AM
Creation date
6/11/2020 11:00:05 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> BIGGS CAAOOSA <br /> ASSOCIATES INC <br /> STRUCTURAL ENGINEERS <br /> 865 The Alameda <br /> San Jose, CA 95126-3133 <br /> Telephone 406-296-5515 <br /> Facsimile 406-296-6114 <br /> February 14, 2020 <br /> 2013122 <br /> City of Pleasanton <br /> 200 Old Bernal Avenue <br /> P.O. Box 520 <br /> Pleasanton, CA 94566-0802 <br /> Attention: Mr.Adam Nelkie <br /> Subject: City of Pleasanton BPMP of 5 Bridges—Federal ID 5101(029) <br /> Construction Support Services <br /> Dear Adam: <br /> Biggs Cardosa Associates, Inc. is pleased to submit the following cost proposal to provide construction <br /> engineering support services on the subject project. <br /> This proposal covers the following services: <br /> A. Project Management while performing Construction Support Services. <br /> B. Performing the review of design related structural shop drawings and structural submittals required <br /> by the project specifications as noted in the following list. <br /> 1. Joint Seal (Type A)Submittal <br /> 2. Joint Seal (Asphaltic Plug)Submittal <br /> 3. Structure Approach Slab Rebar Shop Drawings <br /> 4. Concrete Barrier Type 9 Rebar Shop Drawings <br /> 5. Concrete Barrier Type 27 Rebar Shop Drawings <br /> We have assumed that all other construction related submittals will be reviewed by the City's CM <br /> team. <br /> C. Attend pre-construction meeting. <br /> D. Attend site visits as required to assist in the resolution of construction issues(3 site visits assumed). <br /> E. Review and respond to Contractor RFIs pertaining to construction issues and to clarify the <br /> construction documents during construction. See the estimated hours assumed in the hourly backup <br /> attached for the estimated effort included in this scope of services. <br /> F. Provide Record Drawings based on Contractor's red-lined changes. The Record Drawings will be <br /> drafted using AutoCAD per the current Caltrans Structures guidelines. <br /> V �_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.