Bid Summary-May 27,2020 California Engineering Contractors, 6raniterock Bridgeway Civil Constructlora,no. American CMI Contactors
<br /> Bridge Improvements at Various Locations Federal Engineers Estimate Inc Pleasanton,CA San lose,CA VxaWllq CA Benicia,CA
<br /> Aid No.5101(029)
<br /> Item Quentiry UMmeasuore Item Description Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
<br /> 1 1 LS TRAFFIC CONTROL SYSTEM I 100,00000 S 100,000.00 $ 100,000.00 $ 100,000.00 $ 175,000.00 $ 175,000.00 $ 140,000.00 $ 140,000.00 $ 175,759.25 $ 175,759.25
<br /> 2 I LS JOB SITE MANAGEMENT S 10,00000 5 10.000.00 $ 5,000.00 $ 5,000.00 $ 6,000.00 5 6,000.00 $ 20,000.00 $ 20,000.00 $ 2,500.00 $ 2,500.00
<br /> 3 I LS PREPARE WATER POLLUTION f 10,000.00 f 10,000.00
<br /> CONTROL PROGRAM $ 1,000.00 $ 2000.00 $ 1,500.00 $ 1,500.00 $ 814.00 $ 814.00 $ 2,500.00,$ 2,500.00
<br /> 4 565 LF REMOVE YELLOW PAINTED 0 5.00 3 7,e35.00
<br /> TRAFFIC STRIPE $ 20.00 $ 11,300.00 $ 2.50 $ 1,412.50 $ 5.00 $ 2,825.00 $ 2.50 $ 1,412.50
<br /> 5 1 LS TEMPORARY CREEK 0 10,000.00 S 10,000.00
<br /> DIVERSION SYSTEMS $ 30,000.00 $ 30,000.00 ,$ 1,000.00 $ 1,000.00 $ 70,000.00 $ 70,000.00 $ 75,000.00 $ 75,000.00
<br /> 6 1 LS CONTRACTOR SUPPLIED 5 20,000.00 S 20,000.00
<br /> BIOLOGIST(LS) $ 42,000.00 $ 42,000.00 5 20,000.00 $ 20,000.00 $ 70,000.00 $ 70,000.00 $ 45,000.00 $ 45,000.00
<br /> 7 I LS NOISE MONITORING 5 5,000.00 S 5,000.00 5 1,000.00 $ 1,000.00 $ 1,250.00 $ 1,250.00 $ 4,068.00 $ 4,068.00 $ 2,000.00 $ 2,000.00
<br /> 8 245 TON HOT MIX ASPHALT(BRIDGE) S 250.00 $ 61,250.00 $ 450.00. $ 110,250.00 $ 320.00 $ 78,400.00 $ 335.00 5 132,075.00 $ 316.00 $ 77,420.00
<br /> 9 1,579 SQYD
<br /> COLD PLANE ASPHALT s 20.00 S 3t,580.00
<br /> CONCRETE PAVEMENT $ 10.00 $ 15,790.00 $ 10.00 $ 15,790.00 $ 29.00 $ 45,791.00 $ 24.00 $ 37,896.00
<br /> 10 19 CY AGGREGATE BASE(APPROACH $ 400.00 f 7,600.00
<br /> SLAB) $ 1,000.00 $ 19,000.00 $ 900.00 $ 17,100.00 $ 191.00 $ 3,629.00 $ 500.00 5 9,500.00 '
<br /> Il 196 CY STRUCTURAL CONCRETE, s 1,465.00 S 2e7,140.00
<br /> APPROACH SLAB(TYPE R) $ 2,150.00 $ 421,400.00 $ 1,600.00 $ 313,600.00 5 1,400.00 $ 274,400.00 $ 1,425.00 $ 279,300.00
<br /> 12 158 CF PAVING NOTCH EXTENSION 5 275.00 S 43,450.00 5 125.00 $ 19,750.00 $ 500.00 $ 79,000.00 $ 77.00 $ 12,166.00 $ 200.00 $ 31,600.00
<br /> 13 239 LF CLEAN EXPANSION JOINT 5 35.00 $ 8,365.00 5 25.00 $ 5,975.00 $ 37.00 $ 8,843.00 $ 30.00 $ 7,170.00 $ 35.00 $ 8,365.00
<br /> 14 154 LF JOINT SEAL(MR''A") f 55.00 3 9,470.00 $ 60.00 $ 9,240.00 $ 78.03 $ 12012.00 $ 65.00 $ 10,010.00 $ 45.00 $ 6,930.00
<br /> 15 95 LF JOINT SEAL(MR 1") 3 60.00 S 5,700.00 5 70.00 $ 6,650.00 $ 92.00 $ 8,740.00 $ 71.00 $ 6,745.00 $ 55.00 $ 5,225.00
<br /> 16 203 LF JOINT SEAL(ASPHALTIC PLUG) 5 180.00 f 36,540.00
<br /> $ 125.00 $ 25,375.00 $ 892.00 $ 181,076.00 $ 251.00 5 50,953.00 $ 300.00 $ 60,900.00
<br /> 17(F) 14,208 SQFT DECK SEAL f 4.50 5 63,936.00 $ 2.00 $ 28,416.00 $ 1.00 $ 14,208.00 $ 7.30 $ 103,718.40 $ 3.00 $ 42,624.00
<br /> 18 1 LS PUBLIC SAFETY PLAN 5 6.000.00 f 6,000.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ 16,000.00 $ 16,000.00 $ 7,500.00 $ 7,500.00
<br /> 19 853 LF INJECT CRACK(EPDXY) 5 4000 $ 34,120.00 $ 50.00 $ 42,650.00 $ 65.00 $ 55,445.00 $ 100.00 $ 85,300.00 $ 80.00 $ 68,240.00
<br /> 20 9 CF RAPID SETTING CONCRETE 5 600.00 f 3,400.00
<br /> (PATCH) $ 1,000.00 5 9,000.00 $ 600.00 $ 5,400.00 ,$ 400.00 $ 3,600.00 $ 50.00 $ 450.00
<br /> 21 103 SQFT REPAIR SPALLEO SURFACE 5 250.00 5 25,750.00
<br /> AREA $ 150.00 $ 15,450.00 $ 450.00 $ 46,350.00 $ 950.00 $ 97,850.00 $ 600.00 5 61,800.0
<br /> 22 9 CF REMOVE UNSOUND CONCRETE s 500.00 5 4,500.00 $ 250.00 $ 2,250.00 5 500.00 $ 4,500.00 $ 190.00 $ 1,710.00 $ 500.00 $ 4,500.00
<br /> 23 27,893 SQFT PREPARE CONCRETE BRIDGE f 0.50 S 11,946.50
<br /> DECK SURFACE $ 1.00 $ 27,893.00 $ 1.00 $ 27,893.00 $ 1.30 $ 36,260.90 $ 0.75 5 20,919.75
<br /> 24(F) 27,893 SQFT TREAT BRIDGE DECK 5 2.00 S 55,786.00 $ 1.00 $ 27,893.00 $ 1.50 $ 41,839.50 5 2.00 $ 55,786.00 $ 1.50 $ 41,839.50
<br /> 25 311 GAL FURNISH BRIDGE DECK f 70.00 5 21,770.00
<br /> TREATMENT MATERIAL $ 55.00 $ 17,105.00 $ 55.00 $ 17,105.00 $ 73.00 5 22,703.00 $ 50.00 $ 15,550.00
<br /> 26 28 EA REMOVE PAVEMENT MARKER S 15.00 5 420.00
<br /> $ 1.00 $ 28.00 $ 8.00 $ 224.00 $ 16.00 $ 448.00 5 8.00 $ 224.00
<br /> 27 28 EA PAVEMENT MARKER 5 10.00 f 280.00
<br /> (RETROREFLECTIVE) $ 10.00 $ 280.00 $ 15.00 $ 420.00 $ 30.00 $ 840.00 $ 15.00 $ 420.00
<br /> 28(F) 14 LF CONCRETE BARRIER(TYPE 27) 6 600.00 6 8,400.00 $ 1,000.00 $ 14,000.00 $ 1,500.00 $ 11,003.00 5 492.00 5 6,888.00 $ 1,200.00 $ 16,900.0
<br /> RECONSTRUCT METAL
<br /> 29 20 LF HANDRAILING PORTION 5 350.00 f 7,000.00
<br /> (BRIDGE) $ 150.00 $ 3,000.00 $ 975.00 5 19,500.00 $ 202.00 $ 4,040.00 $ 300.00 $ 6,000.00
<br /> 30(F) 12 LF CONCRETE BARRIER(TYPE 9) 0 600.00 5 7,200.00 $ 1,000.00 $ 12,000.00 $ 1,500.00 $ 18,000.00 $ 471.00 $ 5,652.00 $ 1,400.00 $ 16,800.00
<br /> •
<br /> 31 12 LF RECONSTRUCT METAL RAILING s zoo 00 s x,000 00
<br /> (TYPE 9) $ 400.00 $ 4,800.00 $ 947.00 $ 11,364.W $ 182.00 $ 2,164.00 $ 350.00 $ 4,200.00
<br /> 32 1,205 LF 6"THERMOPLASTIC TRAFFIC 8 5.00 f 6,025.00
<br /> STRIPE $ 10.00 $ 12,050.00 $ 3.25 $ 3,916.25 5 6.50 $ 7,832.50 $ 3.25 $ 3,916.25
<br /> 33 385 LF 8"THERMOPLASTIC TRAFFIC 5 10.00 S 3,e50.00
<br /> STRIPE $ 15.00 $ 5,775.00 $ 3.75 $ 1,443.75 $ 7.50 $ 2,887.50 $ 3.75 $ 1,443.75
<br /> 34 60 SQFT THERMOPLASTIC PAVEMENT 5 11.00 f 660.00
<br /> MARKING $ 20.00 5 1,200.00 $ 10.00 5 600.00 $ 20.00 $ 1,200.00 $ 10.00 5 600.00
<br /> 35 986 LF REMOVE PAINTED TRAFFIC f 5.00 5 4,930.00
<br /> STRIPE $ 4.00 $ 3,944.00 $ 2.50,S 2,465.00 $ 5.00 $ 4,930.00 $ 2.50 $ 2,465.00
<br /> REINSTALL ARCHITECTURAL
<br /> 36 16 SQFT TREATMENT(CULTURED 5 10.00 S 160.00
<br /> STONE) $ 150.00 $ 2,400.00 $ 125.00 $ 2,000.00 $ 250.00 $ 4,000.00 $ 150.00 $ 2,400.00
<br /> 37 1 LS WATER MAIN FLEXIBLE $ 95,000.00 f 95,000.00
<br /> EXPANSION JOINTS $ 225,000.00 $ 225,000.00 $ 127,500.00 $ 127,500.00 $ 125,000.00 $ 125,000.00 $ 275,000.00 $ 275,000.00
<br /> 38 1 LS MOBILIZATION S 119,546.50 $ 119,546.50 $ 65,00020 $ 65,000.00 $ 150000.00 $ 150,000.00 $ 150,000.00 $ 150,000.00 $ 130,000.00 $ 130,000.00
<br /> TcW $1,195,000.00 Total $1,958,664.00 Total $1,503,897.00 Total $1939,476.90 Total $1,545,000.00
<br /> Subcontractors: Subcontractors: Subcontractors: Subcontractors:
<br /> Extreme Pressure Systems,Inc. Austin Enterprise Alanla Construction,Inc. Sierra Traffic Markings,Inc. -IPacific..General Engineerin&Inc Dees Burke Engineering Dees Burke Engineering Constructors OA Constructors -I
<br /> Chrlsp Company Tennyson Electric 8&0 Concrete,Inc. Ichor Restoration D
<br /> Endemic Environmental Services,Inc. CMC Traffic Control CN Reinforcing Camblln Steel Service,Inc.
<br /> Camblin Steel Services,Inc. Sierra Traffic Markings Sierra Traffic Markings,Inc. Platinum Pipeline,Inc.
<br /> Pevoy Electric,Inc. Ichor Restoration Anrak Corporation =
<br /> All Cities Trucking Cablin Steel Service Western Traffic Supply
<br /> North American Fence&Railing
<br /> m
<br /> Z
<br /> -I
<br /> cn
<br />
|