My WebLink
|
Help
|
About
|
Sign Out
ALTAMONT LANDOWNERS SETTLEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
ALTAMONT LANDOWNERS SETTLEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 2:28:47 PM
Creation date
5/13/2004 8:27:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/5/1999
LONG TERM AGREEMENTS - NAME
ALTAMONT LANDFILL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTE MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8.2[ <br /> <br />4.8.3 <br /> <br />4.8.4! <br /> <br />tons. Based on a calendar year calculated at 260 days, this would result in <br />an annual average daily tonnage of solid waste disposed at the ALRRF of <br />approximately 6,154 tons per day, calculated over the entire year. To <br />allow for seasonal fluctuations in solid waste disposal, the average daily <br />tonnage of solid waste accepted in any calendar quarter shall not exceed <br />7000 tons per day. Both this annual tonnage cap and the average daily <br />tonnage cap shall be subject to adjustment as provided in this Condition <br />No. 4.8. During any part of the year 1999 that this permit is in effect, the <br />annual tonnage cap shall be applied on a pro rata basis. <br /> <br />Beginning in the year 2001, the annual tonnage cap and the average daily <br />tonnage cap shall be automatically increased by the Planning Department <br />to the extent required to accommodate additional waste disposal resulting <br />from any one or more of the following factors: (i) additional growth, <br />development or economic activity in Alameda County, San Francisco, or <br />San Ramon as determined by the California Integrated Waste <br />Management Board's ("IWMB") annual indices, and including automatic <br />increases in each calendar year for additional waste generated by projects <br />approved in Alameda County, San Francisco, or San Ramon; (ii) the <br />transfer of any solid wastes or solid waste stream from other landfills in <br />Alameda County for any reason, including without limitation the closure <br />of such landfills or the negotiation of new contracts providing for disposal <br />at the ALRRF, provided that such waste streams originate in Alameda <br />County, San Francisco or San Ramon as provided for in this permit. <br /> <br />Within sixty (60) days after the IWMB releases its annual indices for the <br />previous calendar year, the operator shall provide the Planning <br />Department with a copy of the IWMB indices, and the Planning <br />Department shall automatically increase the annual tonnage cap and <br />average daily cap to the extent required to accommodate additional waste <br />disposal as set forth in Condition No. 4.8.2 above. <br /> <br />For the purposes of calculating automatic cap increases as provided by <br />Condition No. 4.8.2 above, the operator may provide the Alameda County <br />Planning Department with other indices or factors that support, update or, <br />in the absence of the IWMB's indices, substitute for the IWMB's annual <br />indices. The operator shall simultaneously provide copies of all such <br />materials to the Cities of Livermore and Pleasanton, and representatives of <br />the Sierra Club, the Northern California Recycling Association and <br />Altamont Landowners Against Rural Mismanagement in addition to the <br />County, and the County shall promptly make all such materials available <br />to the public upon request. The Planning Department may use such <br />indices or factors in determining appropriate increases to the annual <br />tonnage cap and average daily cap for the purposes of calculating <br />automatic increases to the annual tonnage cap and average daily cap but <br />shall take no action granting an automatic cap increase based on such <br />indices or factors any sooner than twenty-one (21) days after the receipt of <br /> <br />5-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.