Laserfiche WebLink
disposal and imports in this permit, the footprint of the landfill expansion <br />solid <br /> waste <br />shall be limited to approximately 250 acres. <br /> <br />Most of the followin~ Conditions of Approval, Nos. 7 to 82, are a condensation and <br />simplification of mitlgation measures identified in the Final EIR as revised which should not be <br />construed so as to diminish or eliminate responsibility of the operator for full mitigation of <br />environmental impaclts identified in the Final EIR. In implementation of these Conditions of <br />Approval or in the extent that a question arises as to how the operator or County shall proceed in <br />mitigation of impact~, the Final EIR shall be consulted for guidance for a determination by the <br />Planning Commission. <br /> <br />Mitigation measures ~vere crafted to address the impacts identified for the original project and <br />will be sufficient to ~over any situation created for the reduced project approved herein. Other <br />conditions reflect local, state and federal requirements that may not address specific mitigation <br />measures for impact~ identified as part of the EIR. These include legal liability, general <br />operational conditiorls, design, construction and regulatory standards, periodic review, and <br />various fees. : <br /> <br />LAND USE <br /> <br />Buffer zonesi shall be retained on site around the perimeter of the landfill footprint <br />substantially [ts indicated on Exhibit 1. <br /> <br />The operator ~hall apply to the Livermore Area Recreation and Park District to modify its <br />1991 Regionhl Trail Plan to recognize the proposed Class II Landfill Expansion project. <br />Should a trai! across or adjacent to Section 17 be constructed, the operator shall provide <br />appropriate s~gnage and fencing around the portion of the wildlife mitigation area that is <br />nearest the trail. <br /> <br />The operatorl shall initiate site closure activities when the landfill achieves final grade. <br />Closure and post-Closure Plans shall be designed such that the landfill would support <br />agricultural ~ses after closure and reclamation. A program shall be prepared for <br />submittal andreview to the United States Department of Agriculture, Soil Conservation <br />Service, for restoration of the project site to agricultural capability. Upon closure, the <br />project shall be "visually integrated" with the surrounding terrain through sensitive <br />grading and revegetation with native plant materials. <br /> <br />10. <br /> <br />As part of t~e required Site Development Review (SDR) for permitted development <br />within the A (Agricultural) District, the Alameda County Planning Department will <br />review prop(~sed development of the legal building site parcels within 4,000 feet of the <br />ALRRF Expansion footprint for consistency and compatibility with surrounding uses. <br />The operato~ shall provide reasonable funding for any study of the health and safety <br />impacts of tl~e ALRRF expansion on such development that the Planning Department <br />reasonably d~termines is a necessary part of the SDR. <br /> <br />8-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />