My WebLink
|
Help
|
About
|
Sign Out
ALTAMONT LANDOWNERS SETTLEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
ALTAMONT LANDOWNERS SETTLEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 2:28:47 PM
Creation date
5/13/2004 8:27:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/5/1999
LONG TERM AGREEMENTS - NAME
ALTAMONT LANDFILL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTE MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. <br /> <br />aesthetic effe~:ts on sensitive viewpoints. Al/transfer vehicles and direct-haul collection <br />vehicles that idispose at ALRRF shall be enclosed as needed to prevent rubbish from <br />escaping the ivehicle in ronte. The operator shall minimize the distance between the <br />tippers and tl~e tip area to minimize airborne litter. Refuse shall be compacted promptly <br />to reduce amounts of blowing litter. A litter-control fence shall be installed downwind of <br />the fill area td trap airborne refuse. <br /> <br />Where feasible, and to the extent possible, the operator shall locate soil stockpiles within <br />basins in the~xisting topography, with heights generally not to exceed surrounding ridge <br />lines. The operator shall seed larger stockpiles and cut surfaces that are not active for an <br />extended peribd (more than one season). <br /> <br />HISTORIC/ARCHAEOLOGICAL RESOURCES <br /> <br />14. <br /> <br />The operato~ shall implement a program for a qualified archaeologist to complete <br />recordation and investigation of known sites that would be disturbed, removed or <br />destroyed dUring the construction of the proposed project and comply with the <br />requirements !of the State Historic Preservation Officer (SHPO). Prior to excavation and <br />construction, the prime construction contractor and any subcontractor(s) shall be <br />cautioned oni the legal and/or regulatory implications of knowingly destroying cultural <br />resources or flemoving artifacts, human remains, bottles, and other cultural materials from <br />the project si~e. <br /> <br />(a) <br /> <br />(b) <br /> <br />The qUalified archaeologist shall have the authority to temporarily halt excavation <br />and cgnstruction activities in the immediate vicinity (ten-meter radius) of a find if <br />significant or potentially significant cultural resources are exposed and/or <br />adversely affected by construction operations. <br /> <br />Reasonable time shall be allowed for the qualified archaeologist to notify the <br />propel' authorities for a more detailed inspection and examination of the exposed <br />culturhl resources. During this time, excavation and construction shall not be <br />allowed in the immediate vicinity of the find; however, those activities could <br />continue in other areas of the project site. <br /> <br />(c) <br /> <br />If any find were determined to be significant by the qualified archaeologist, <br />representatives of the construction contractor and Alameda County, the qualified <br />archaeologist, and a representative of the Native American community (if the <br />discovery is an aboriginal burial) shall meet within seven calendar days to <br />determine the appropriate course of action for recording and removing any <br />culturhl resources or remains. <br /> <br />OTHER COMMUNITY SERVICES <br /> <br />15. <br /> <br />The operato~ shall apply security systems to the operation of the Class II Landfill <br />Expansion tolpreclude unauthorized entry by persons or vehicles. These systems include <br />posting a 24~hour guard, maintaining fencing around the site perimeter, maintaining <br /> <br />10-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.