My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
030221
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 9:05:47 AM
Creation date
2/25/2021 9:05:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/2/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> Change Orders <br /> Change Order No. 1 for $54,435.82 added a sixth construction phase to the schedule to <br /> safely implement traffic control as there was an insufficient amount of room to maintain <br /> sufficient lanes for the southbound Santa Rita Road traffic in the northwest quadrant. <br /> Change Order No. 2 for $7,748.66 removed the top portion of the existing grade beams <br /> at the approach slabs to allow for the new concrete approach slab at the Santa Rita <br /> Road Bridge. <br /> Change Order No. 3 for $4,256.20 replaced curb and gutter in the southbound approach <br /> roadway of the Santa Rita Road Bridge to improve drainage. <br /> Change Order No. 4 for a $10,000 credit for the elimination of the work to remove the <br /> approach slab under the sidewalk portion in the southeast quadrant at Santa Rita. This <br /> work was revealed to be unnecessary during construction. <br /> Change Order No. 5 for a $3,162 credit for salvaging existing street light poles and lights <br /> instead of replacing the poles at the Santa Rita Road Bridge. (This work in not eligible for <br /> grant funding and credited toward water funding.) <br /> Change Order No. 6 for $68,050 added 1,361 linear feet of crack injection repairs at <br /> West Las Positas Boulevard and Owens Drive as the cracking was much more extensive <br /> than anticipated. <br /> Change Order No. 7 for $28,207.36 replaced portions of sidewalk and curb and gutter at <br /> the northbound approach roadway at the Santa Rita Road Bridge approach to address <br /> water ponding, added temporary k-rail to improve safety after three collisions occurred <br /> during construction, and modifications of the existing concrete grade beam at Santa Rita <br /> Road Bridge that conflicted with the approach slab. <br /> Change Order No. 8 and No. 9 totaling $49,880.76 for work associated with locating the <br /> existing water line that did not match record drawings, installation of an isolation valve, <br /> disposal of asbestos pipe, restoration, and various other water line changes at the Santa <br /> Rita Road Bridge. (This is Caltrans non-participating work and charged toward water <br /> funding.) <br /> Change Order No. 10 for $27,574.25 for expanded limits of paving, clean-up of oil on the <br /> bridge deck from Bay Cities Paving & Grading, Inc., and traffic control to accommodate <br /> the City's Annual Resurfacing Program at the Santa Rita Road Bridge. Due to the <br /> additional phase of construction and delays from the water line work, the bridge work <br /> was not completed in time for the Annual Resurfacing Project start and an expanded limit <br /> of paving was necessary. (This is Caltrans non-participating work and changed toward <br /> street funding.) <br />