Laserfiche WebLink
1. PLEASAN' <br /> costs f, <br /> utility <br /> exceed i <br /> enginee] <br /> constru( <br /> includi! <br /> <br />The final <br />be based <br />except fl <br />the ADDI! <br />prioriti: <br /> <br />The fina2 <br />be $965,' <br />June 13 <br />Item 2 ~ <br />differer <br />bid (in¢ <br /> <br />Low <br />Low <br /> <br />Priority <br /> <br />The final <br />shall be <br />during c¢ <br /> <br />EXHIBIT "C" <br /> <br />COST OF CONSTRUCTION <br /> <br />?ON's COST OF CONSTRUCTION shall be the final construction <br />)r the ADDITIONAL IMPROVEMENTS including all required <br />relocation, plus construction engineering costs not to <br />.~% of the f~nal construction costs, plus nrelim~ <br />,lng and design costs not to exceed 12% of=the <br />:tion cost, minus any funds received from outside sources <br />~g but not limited to CALTRANS, such as SB 300 funding. <br /> <br />Sample Calculation: <br /> <br />COST OF CONSTRUCTION <br /> <br />HACIENDA <br /> HL-2 $225,368 <br /> Bridge 965,722 <br /> HR-3 RamD 351,060 <br /> <br />~ANTA RITA-TASSAJARA <br /> Utility Relocation <br /> TR~3 Ramp <br /> <br />Subtotal Construction <br /> Construction Engineering (10%) <br /> <br />SB 300 (21.773%) <br /> <br />$1,542,150 <br /> <br />$370,415 <br />$317,122 <br />$687,537 <br /> <br />$2,229,687 <br /> 222,969 <br />$2,452,656 <br /> (534,017) <br /> <br /> Design (12%) $1,918,639 <br /> 267,562 <br />TOTAL $2,186,201 <br /> <br />· construction costs for the ADDITIONAL IMPROVEMENTS shall <br />on the final quantities of the respective contracts <br />Dr priority item 2 which is described below. Elements of <br />~IONAL IMPROVEMENTS are described in Exhibit B and <br />:ed in Exhibit J. <br /> <br />construction cost for priority item 2 (Exhibit J) shall <br />21.65. This is based on bids received by PLEASANTON on <br />1990. The bids contained construction alternatives. The <br />'iority was included in the alternative bid. The <br />:e in the base bid (excluding Item 2) and the alternative <br />.uding Item 2) is as follows: <br /> <br />Bid (Alternative Contract) <br />Bid (Base Contract) <br /> <br />$6,167,843.45 <br />$5,202,121.80 <br /> <br />Item #2 Final Construction Cost $ 965,721.65 <br /> <br /> construction costs for priority elements 1, 3 and 5 <br />based on the following spread sheets as may be modified <br />nstruction: <br /> <br /> <br />