My WebLink
|
Help
|
About
|
Sign Out
SURFACE RD DOUGHERTY TASS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
SURFACE RD DOUGHERTY TASS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2011 1:36:55 PM
Creation date
5/14/2004 9:10:31 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/11/1991
LONG TERM AGREEMENTS - NAME
TWO LANE ACCESS ROAD
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
HACIENDA DRIVE EXT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Se <br /> <br />The fin~ <br />(prioril <br />establi: <br />respect: <br />incorpo] <br /> <br />Company <br /> <br />.1 construction cost for the relocation of utilities <br />~y item 4) will be PLEASANTON's share of the costs as <br />~hed by existing agreements between PLEASANTON and the <br />.ye utility companies which are attached hereto and <br /> <br />'ated herein as Exhibit K, and as follows: <br /> <br />Document No. <br /> <br />Utility Agreement #788.2 <br />Utility Agreement #788.3 <br />Utility Agreement #789.3 <br /> <br />Location <br /> <br />HL2 on ramp <br />Hacienda Overpass <br />HR3 on ramp <br />Utility relocation (TR3 <br />TR3 on ramp <br /> <br />ramp) <br /> <br />Estimated Total <br /> <br />PG&E (Gas) <br />PG&E (Electr~.c) <br />Pacific Tele)hone <br /> <br />SUMMARY OF )STS <br />Priority <br /> <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> <br />Date <br /> <br />10/22/90 <br />10/22/90 <br />9/04/90 <br /> <br />Est. Cost <br /> <br />$ 225,368 <br />$ 965,722 <br />$ 351,060 <br />$ 370,415 <br />$ 317,122 <br /> <br />$2,229,687 <br /> <br />6e <br /> <br />Es~. Cost <br /> <br />$232,500 <br />$110,000 <br />$ 27,915 <br /> <br />$370,415 <br /> <br />At the <br />PLEASAN <br />OF CONS <br />prelimi <br />enginee <br />PLEASA~ <br />COST O~ <br />PLEASA~ <br />include <br />resolve <br />Paragre <br /> <br />the bid of these items. <br /> <br />hall have the right periodically to conduct an audit of <br />rON's costs, provided advance written notice is provided by <br />to PLEASANTON. <br /> <br />=onclusion of construction of the ADDITIONAL IMPROVEMENTS, <br />tON shall submit to DUBLIN a final accounting of the COST <br />~RUCTION in a format which reflects the total costs for <br />nary engineering, design, utility relocation, construction <br />ring and construction and indicates actual payments made by <br />TON. DUBLIN may conduct an audit of final accounting of the <br />CONSTRUCTION. If there is any dispute between DUBLIN and <br />TON regarding whether any item or items of cost should be <br />d within the COST OF CONSTRUCTION, such dispute will be <br />d through final and binding arbitration as provided in <br />ph 11. <br /> <br />DUBLIN <br />PLEASAN <br />DUBLIN <br /> <br />prior t <br /> <br />The final construction cost of priority items 6, 7, and 8 will be <br />based ox actual construction costs for the work completed. The <br />format for said costs will be similar to the format in section 4 <br />above and will be mutually agreed between DUBLIN and PLEASANTON <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.