My WebLink
|
Help
|
About
|
Sign Out
SURFACE RD DOUGHERTY TASS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
SURFACE RD DOUGHERTY TASS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2011 1:36:55 PM
Creation date
5/14/2004 9:10:31 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/11/1991
LONG TERM AGREEMENTS - NAME
TWO LANE ACCESS ROAD
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
HACIENDA DRIVE EXT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> <br /> 1. PL~ <br />construction ~ <br />EXTENSION, pl~ <br />construction <br />inspection se: <br />final constru. <br />costs not ~o . <br />funds receive <br />CALTRANS, sucl <br />COSTS OF CONS' <br /> <br /> 2. DUB <br />audit of PLF2 <br />provided by D <br /> <br /> 3. Whe <br />HACIENDA DRI~ <br />submit to DU~ <br />in a format <br />engineering, <br />and construct <br />DUBLIN may cc <br />OF CONSTRUCT] <br />PLEASANTON re <br />included with <br />resolved thr( <br />paragraph 18. <br /> <br />COSTS OF CONSTRUCTION <br /> <br />~SANTON's COSTS OF CONSTRUCTION shall be the final <br />:osts for the TWO LANE ACCESS ROAD and HACIENDA DRIVE <br />is the cost of all required utility relocation, plus <br />~ngineering costs (including payment to DUBLIN for <br />:vices under paragraph 3(d)) not to exceed 10% of the <br />:tion costs, plus preliminary engineering and design <br />xceed 10% of the final construction cost, minus any <br />from outside sources including but not limited to <br />as SB 300 funding. In no event shall PLEASANTON'S <br />~CTION exceed $3.8 million. <br /> <br />LIN shall have the right periodically to conduct an <br />SANTON's costs, provided advance written notice is <br />JBLIN to PLEASANTON. <br /> <br />~ DUBLIN has accepted the TWO LANE ACCESS ROAD and <br />'E EXTENSION as a public street, PLEASANTON shall <br />~IN a final accounting of the COSTS OF CONSTRUCTION <br />which reflects the total costs for preliminary <br />[esign, utility relocation, construction engineering <br />[on and indicates actual payments made by PLEASANTON. <br />nduct an audit of the final accounting of the COSTS <br />ON. If there is any dispute between DUBLIN and <br />~arding whether any item or items of cost should be <br />in the COSTS OF CONSTRUCTION, such dispute shall be <br />~ugh final and binding arbitration as provided in <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.