My WebLink
|
Help
|
About
|
Sign Out
BRIDGE ON SANTA RITA
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
BRIDGE ON SANTA RITA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2007 9:30:40 AM
Creation date
5/14/2004 9:39:32 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/21/1989
LONG TERM AGREEMENTS - NAME
BRIDGE ON SANTA RITA
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-05
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tile Alameda County Flood Contro] ~nJ I,"~. (~?~r~'et~on District (herein- <br />after referred to as )ISTRICT) and the City of ~'3casaato:~ (hereinafter referred ~o <br />as CITY) hereby agree as follows: <br /> <br /> 1. Recital and ~poses <br /> <br /> This [ification is made having considered <br /> <br /> executed to accomplis] the p~poses hereinafter ~'eeited: <br /> <br /> a. DIS' RICT and CITY entered into an a~reemeat on November 2, 1971~ <br />providing for the con;;truct~on of a new bridge at the Santa Rita Road crossing <br />the ~royo Mocho, a of the Special Drainag~ Area 7-1 I~ojeet. <br /> <br /> b. agreement contained, ia Section 3, ~ragraph (a), provision for <br />each party to bear on, -half of the cost of construction of the subject bridge and a <br /> <br />timely estimate was and determined to be $325,0~. <br />c. agreement also included, in Paragraph 3b~ reference to an <br />attached ~ent incor~rated as "~hibit A." <br /> <br /> d. Com~truction cost advances in the intervening time and a more <br />detailed estimate ind:.cate that the cost sharing provisions should be based on an <br /> <br />estimated $438,~. ~ the cost estimate for CITY-owned water line that is to <br />be realigned at request of CITY. <br /> <br /> 2. Modific~ bion <br /> a. DIS[ and CITY agree that Paragraph (f) shall be added tc <br /> <br />Section 2 to provide he following: <br /> <br /> (f) CI~ agrees to realign or cause to be realigned its <br /> <br /> 14 Wat~ r Supply line in Santa Rita Road. <br /> <br /> b. and CITY also agree that Paragraph (a) of Section 3 of said <br /> <br />agreement is m~ified to read as follows: <br /> <br /> (a) 1) CI~ agrees to solely bear the c'ost of the above <br /> <br /> mention~ realignment of the 14" Water line, the cost of which <br /> realJ is estimate~ to be $12,O00. CI'~ will deposit with <br /> <br /> the estimated amoo~nt ($12,~.) on demand of DISTRICT <br /> <br /> which d~ ~oslt will be ap?lied to vhe bid ivcas <br /> <br /> Pipe," Welded Steel Pipe" and "8" x 4' Concrete Cap." <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.