My WebLink
|
Help
|
About
|
Sign Out
BRIDGE ON SANTA RITA
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
BRIDGE ON SANTA RITA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2007 9:30:40 AM
Creation date
5/14/2004 9:39:32 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/21/1989
LONG TERM AGREEMENTS - NAME
BRIDGE ON SANTA RITA
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-05
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Alamed~ <br /> after referred to as <br /> as CITY) hereby agre~ <br /> <br /> 1. Recita~ <br /> This mc <br /> <br /> executed to accompli~ <br /> <br /> a. DIE <br />providing for the co~ <br />the Arroyo Mocho, a <br /> <br /> b. Ss <br />each party to bear o~ <br />timely estimate was <br /> <br />c. Sa <br />attached payment sche <br /> <br /> d. Con <br />detailed estimate ind <br /> <br />MODIFICATION OF <br /> <br /> County Flood Control and Water Conservation District (herein- <br /> DISTRICT) and the City of Pleasanton ~herelnafter referred to <br /> as follows: <br /> <br /> and Purooses <br /> <br />dification is made having considered the following facts and is <br />h the purposes hereinafter recited: <br /> <br />TRICT and CITY entered into an agreement on November 2, 1971~ <br />struction of a new bridge at the Santa Rita Road crossing of <br />ortion of the Special Drainag? Ares 7-1 Project. <br /> <br /> agreement contained, in Section 3, Paragraph (a), prcvision for <br /> <br /> -half of the cost of construction of the subject bridge and a <br />· de and determined to be $325,000. <br /> <br /> agreement also included, in Paragraph 3b, reference to an <br />~le, incorporated as "Exhibit A." <br />~truction cost advances in the intervening t~e and a more <br />[cate that the cost sharing provisions should be based on an <br /> <br />estimated $438,000. e¢cluding the cost estimate for CITY-owned water line that is to <br />be realigned at recen request of CITY. <br /> <br /> 2. Modific <br /> a. DIS <br /> <br />Section 2 to provide <br /> <br /> l~ Wat. <br /> <br /> b. DIS' <br />~greement is modified <br /> <br /> (a) <br /> <br /> mention, <br /> realign: <br /> DISTRICt <br /> which d~ <br /> Pipe," <br /> <br /> tion <br /> <br />· ICT and CITY agree that Paragraph (f) shall be added to <br /> <br />~he following: <br /> <br /> CITY agrees to realign or cause to be realigned its <br /> <br />~r Supply line in Santa Rita Road. <br /> <br />~ICT and CITY also agree that Paragraph (a) of Section 3 of said <br />to read as follows: <br /> <br />l) CITY agrees to solely bear the cost of the above <br />~d realignment of the 14" WatJr line, the cost of which <br />lent is estimated to be $12,000. CITY will deposit with <br /> <br /> the estLmated amount ($!2,OOO.) on demand of DISTRXCT <br /> <br /> posit will be applied t~ the bid items "lA" Ductile Iron <br /> <br /> 14" Welded Steel Pipe" and "$" x 4' Concrete Cap." <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.