My WebLink
|
Help
|
About
|
Sign Out
LINE B-2-3 AND B-2-4
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
LINE B-2-3 AND B-2-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2011 11:43:40 AM
Creation date
5/14/2004 10:35:01 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/10/1987
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PROJECT 86-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> <br />10 <br /> <br />11 <br /> <br />12 <br /> <br />13 <br /> <br />14 <br /> <br />18 L.F. <br /> <br />90 L.F. <br /> <br />6 EA. <br /> <br />I EA. <br /> <br />9 EA. <br /> <br />i EA. <br /> <br />8" Corrugated Metal Pipe <br />including trenching and back- <br />fill complete in place at <br /> <br />Per Each <br /> <br />72" Corrugated Metal P'ipe <br />including trenching and back- <br />fill, complete in place at <br /> <br />Per Lineal Foot <br /> <br />Standard Manhole, Type I, <br />including frame and cover, <br />complete in place at <br /> <br />Per Each <br /> <br />Field Inlet including grate, <br />complete in place at <br /> <br />Per Each <br /> <br />Pre-cast drop inlet, complete <br />in place at <br /> <br />Per Each <br /> <br />21" Pre-cast concrete end <br />section, complete in place at <br /> <br />Per Each <br /> <br />Standard Lateral Pipe Entry @ <br />Sta. 0+12, complete in place at <br /> <br />Per Each <br /> <br />15 <br /> <br />16 <br /> <br />17 <br /> <br />I EA. <br /> <br />I EA. <br /> <br />i EA. <br /> <br />Standard Lateral Pipe Entry <br />at Sta. 3+20, complete in <br />place at .. <br /> <br />Per Each <br /> <br />Standard Lateral Pipe Entry at <br />Sta. 5+90, complete in place <br />at <br /> <br />Per Each <br /> <br />CDS. 1.5 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.