My WebLink
|
Help
|
About
|
Sign Out
LINE B-2-3 AND B-2-4
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
LINE B-2-3 AND B-2-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2011 11:43:40 AM
Creation date
5/14/2004 10:35:01 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/10/1987
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PROJECT 86-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15-10 <br /> <br />15-11 <br /> <br />Curing: The contractor shall be responsible for proper curing of the <br />concrete and backfilling the trench to an even grade. Curing shall be <br />performed in such a manner as to prevent the premature drying of the <br />concrete. The contractor shall use one of the methods described as <br />follows in Subsection a), b), c) or d). <br /> <br /> a) A 3-inch layer of moist loose soil or sand shall be carefully <br />placed over the top of the pipe immediately after the pipe is cast. The <br />backfill shall be materially free of clods or rocks having a diameter <br />greater than 2 inches, roots, or other deleterious foreign material. <br />The backfill shall be carefully placed over the top of the pipe to <br />prevent injury to the wet concrete. The thickness of the backfill shall <br />be increased to 6 inches after initial set of the concrete has occured. <br />The backfill shall be kept moist at all times until the pipe has been <br />covered to a depth of 12 inches or more. Final backfill, and compaction <br />where required, shall not be started until the pipe has developed <br />sufficient strength to support the loads to be imposed and shall conform <br />to local requirements and to project specifications. <br /> <br /> b) The exposed top portion of the pipe may be covered with wet <br />burlap or other material of high moisture retentive properties <br />immediately after the pipe is cast. The covering material shall be kept <br />continuously moist until the placement of final backfill as described <br />under Subsection a). Moisture retentive material may be removed or left <br />in place at the option of the contractor. <br /> <br /> c) A pigmented membrane-curing compound conforming to the <br />"Specifications for Liquid Membrane-Forming Compounds for Curing <br />Concrete" (ASTM C 309) may be applied to the exposed top surface <br />immediately after the pipe is cast. The compound shall be applied at <br />the rate of not less than I gallon for each 150 sq. ft. of exposed <br />concrete. The pipe shall then be covered with a maximum of 3 inches of <br />moist loose soil when the curing compound is sufficiently hard to resist <br />damage from the fill. Final backfill shall be placed as soon as the <br />pipe attains suitable strength. <br /> <br /> d) Polyethylene film complying with ASTM C 171 may be placed on <br />the exposed top surface of the pipe immediately after the pipe is cast. <br />The film shall immediately be anchored in place with loose soil to <br />assure continuous, adequate curing. When the concrete has set <br />sufficiently hard to resist damage from fill, the pipe shall be covered <br />with a minimum of 3 inches of moist lbose soil. The trench shall be <br />completely backfilled as soon as the pipe attains suitable strength. <br /> <br />Humidity: A humid atmoshere within the pipe as evidenced by condensa- <br />tion on the interior surface shall be maintained for at least seven days <br />following placement except for maximum period of 48 hours allowed for <br />removing forms and making repairs. To prevent air drafts which may dry <br />the pipe and to maintain a humid atmosphere inside the pipe, all <br />openings into the pipeline shall be kept closed or covered except when <br />and where work is actually in progress on the inside of the pipe. If <br />necessary to promote high humidity, the pipeline shall be partially <br />filled with ponded water during the curing period. <br /> <br />CDS.1.14 <br /> <br />15-4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.