My WebLink
|
Help
|
About
|
Sign Out
SPORTS PARK IMPROVEMENTS 1983
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
SPORTS PARK IMPROVEMENTS 1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2010 4:33:46 PM
Creation date
5/14/2004 11:20:27 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/12/1983
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> <br /> WHEREAS, it is to the mutual benefit of CITY and ZONE 7 to carry out <br />certain work efforts on a cooperative basis; <br /> <br /> NOW, THEREFORE, based on the foregoing mutual understandings, ZONE 7 <br />and CITY agree as follows: <br /> <br />I. Responsibility of ZONE 7 <br /> <br /> A. ZONE 7 agrees to allow CITY to design, administer and construct a <br /> 12-inch ductile iron pipe water line to replace an existing ZONE 7 8-inch <br /> above-ground steel pipeline and a telemetry conduit within the same trench. <br /> Said lines shall be located within the same easement as the existing 8-inch <br /> pipeline from Well No. 3 to Well No. 4, as shown on attached map (Exhibit "A"). <br /> The existing 8-inch pipeline shall be removed upon acceptance of new 12-inch <br /> water line. In furtherance thereof, ZONE 7 agrees to do the following: <br /> <br />1. Review and approve water line and telemetry conduit plans and <br /> specifications. <br /> <br />2. Inspect the construction of water line and telemetry conduit <br /> unless this function is delegated to CITY. <br /> <br />Pay the CITY, upon billing, for two-thirds the cost of design <br />and construction of said 12-inch water line and for the full <br />cost (100%) of design and construction of the telemetry conduit. <br />Design costs are to be based upon CITY's agreement with their <br />design consultant, Ruth and Going, Inc., dated June 8, 1982 <br />(Exhibit "B," Section IV.A., pg. 4). Bids for the above work <br />shall he submitted to ZONE 7 for approval by its General Manager <br />prior to award of construction contract. Construction costs are <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.