My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS 1-2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
031621
>
13 ATTACHMENTS 1-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 1:45:16 PM
Creation date
3/12/2021 1:45:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/16/2021
DESTRUCT DATE
15Y
Document Relationships
13
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\031621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FI RSTCAR B O N Letter <br /> SOLUTIONS Proposal <br /> FCS INTERNATIONAL.INC. <br /> • Printing costs are based on the method of printing and binding proposed, numbers of copies <br /> proposed as work products,and estimated page lengths. Document printing costs are estimated <br /> and will be finalized at the time of printing. On further clarification of the documents and County's <br /> (paper and/or digital CD)that County staff will need during the preparation effort, FCS will <br /> specifically identify a detailed reproduction work plan with more specific costs. <br /> • Once the Project Description has been approved by the City, if there is a change in the Project <br /> Description that impacts the environmental review, a budget adjustment will be required to <br /> account for the project revisions. <br /> • This price is based on completion of the work within the proposed schedule. If delays occur, an <br /> amendment of the price would be warranted to accommodate additional project management <br /> and other costs,and to reflect adjustments for updated billing rates. <br /> • The fee is valid for up to 90 days from the date of this scope,after which it may be subject to revision. <br /> • Any delays out of FCS's control due to COVID-19 and otherwise will require modification to the <br /> schedule, accordingly. <br /> • City staff will be responsible for distribution of documents. <br /> • Costs have been allocated to tasks based upon FCS's proposed approach. During the work, FCS <br /> may, on its sole authority, re-allocate costs among tasks and/or direct costs, as circumstances <br /> warrant,so long as the adjustments maintain the total price within its authorized amount. <br /> • The FCS Project Manager will be the primary representative at the project meeting and public <br /> hearing. <br /> Invoice Billing <br /> Invoices will be submitted monthly and will identify project progress on a percent complete basis. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 22 <br /> FI RSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.