My WebLink
|
Help
|
About
|
Sign Out
CROW SPIEKER SINGLETON 1985
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
C
>
CROW SPIEKER SINGLETON 1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2007 11:42:53 AM
Creation date
5/18/2004 8:09:40 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
5/21/1985
LONG TERM AGREEMENTS - NAME
CROW
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
DEVELOPMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Approval, having received final City Approvals. I2 the <br />traffic study analysis shows that any affected intersection <br />would exceed the Level of Service D (equal to or greater <br />than 91% of capacity) but can be mitigated so as to be no <br />greater than mid-Level of Service D (86% of capacity) after <br />mitigation, the City shall condition approval upon <br />implementation of those mitigation measures. No building <br />permit may be issued until programs for implementation of <br />mitigation are established. If the traffic study analysis <br />shows any affected intersection would exceed Level of <br />Service D (equal to or greater than 91% of capacity), and <br />indicates that there are no mitigation measures the Owner <br />can implement to improve the affected intersection to mid- <br />Level of Service D (86% of capacity), then the City shall <br />not approve the application for design review and no <br />building permit shall be issued. <br /> <br /> (b) Procedure for Approval. City shall <br />approve the traffic study analysis if it meets the standards <br />set forth in subparagraph (a) above. City shall act upon <br />approval of the traffic study analysis simultaneously with <br />the application for design review approval and if the City <br />approves the traffic study analysis with respect to any <br />Project, its approval shall become effective sixty (60) days <br />following the effective date of its final design approval of <br />such Project. <br /> <br />-3- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.