Laserfiche WebLink
Appendix D <br />UWMP Checklist <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />X X <br />THE CITY OF <br />■ n .0 <br />PLEASANTON. <br />Section 7.3 10635(b)(3) Include a comparison of the total water supply sources <br />Water Supply <br />Section 7.2.3 <br />available to the water supplier with the total projected <br />Reliability <br />water use for the drought period. <br />Assessment <br />Section 7.3 10635(b)(4) Include considerations of the historical drought <br />Water Supply <br />Section 7.1.2 <br />hydrology, plausible changes on projected supplies and <br />Reliability <br />demands under climate change conditions, anticipated <br />Assessment <br />regulatory changes, and other locally applicable criteria. <br />Chapter 8 10632(a) Provide a water shortage contingency plan (WSCP) with <br />Water Shortage <br />Section 8.2 and <br />specified elements below. <br />Contingency <br />Appendix M <br />Planning <br />Chapter 8 10632(a)(1) Provide the analysis of water supply reliability (from <br />Water Shortage <br />Appendix M <br />Chapter 7 of Guidebook) in the WSCP <br />Contingency <br />(Section 1.0) <br />Planning <br />Section 8.10 10632(a)(10) Describe reevaluation and improvement procedures for <br />Water Shortage <br />Appendix M <br />monitoring and evaluation the water shortage <br />Contingency <br />(Section 10.0) <br />contingency plan to ensure risk tolerance is adequate <br />Planning <br />and appropriate water shortage mitigation strategies <br />are implemented. <br />Section 8.2 10632(a)(2)(A) Provide the written decision- making process and other <br />Water Shortage <br />Appendix M <br />methods that the supplier will use each year to <br />Contingency <br />(Section 2.1) <br />determine its water reliability. <br />Planning <br />Section 8.2 10632(a)(2)(B) Provide data and methodology to evaluate the <br />Water Shortage <br />Appendix M <br />supplier's water reliability for the current year and one <br />Contingency <br />(Section 2.2) <br />dry year pursuant to factors in the code. <br />Planning <br />Section 8.3 10632(a)(3)(A) Define six standard water shortage levels of 10, 20, 30, <br />Water Shortage <br />Appendix M <br />40, 50 percent shortage and greater than 50 percent <br />Contingency <br />(Section 3.0) <br />shortage. These levels shall be based on supply <br />Planning <br />conditions, including percent reductions in supply, <br />changes in groundwater levels, changes in surface <br />elevation, or other conditions. The shortage levels shall <br />also apply to a catastrophic interruption of supply. <br />Section 8.3 10632(a)(3)(B) Suppliers with an existing water shortage contingency <br />Water Shortage <br />N/A <br />plan that uses different water shortage levels must <br />Contingency <br />cross reference their categories with the six <br />Planning <br />standard categories. <br />Section 8.4 10632(a)(4)(A) Suppliers with water shortage contingency plans that <br />Water Shortage <br />Appendix M <br />align with the defined shortage levels must specify <br />Contingency <br />(Section 4.3) <br />locally appropriate supply augmentation actions. <br />Planning <br />Section 8.4 10632(a)(4)(B) Specify locally appropriate demand reduction actions to <br />Water Shortage <br />Appendix M <br />adequately respond to shortages. <br />Contingency <br />(Section 4.1) <br />Planning <br />Section 8.4 10632(a)(4)(C) Specify locally appropriate operational changes. <br />Water Shortage <br />Appendix M <br />Contingency <br />(Section 4.4) <br />Planning <br />Section 8.4 10632(a)(4)(D) Specify additional mandatory prohibitions against <br />Water Shortage <br />Appendix M <br />specific water use practices that are in addition to <br />Contingency <br />(Section 4.2) <br />state -mandated prohibitions are appropriate to <br />Planning <br />local conditions. <br />D-5 <br />City of Pleasanton <br />Last <br />Revised: 05-05-21 <br />