Laserfiche WebLink
15 <br />EBDA/LAVWMA Master Agreement July 1, 2021 <br />agencies. <br />LAVWMA may discharge Agency-Generated Brine or any other waste treated by a LAVWMA <br />member agency through its full secondary treatment process into the EBDA System, provided <br />that it is properly included in LAVWMA’s effluent samples and all permit conditions for doing <br />so are met. <br />5.13 Brine Management (Other). For brine that is generated by an entity other than a <br />LAVWMA member agency or from a source other than LAVWMA-agency wastewater, a formal <br />agreement must be unanimously approved by the EBDA Commission. The agreement will <br />generally include the following: <br />a) Provision for EBDA to unilaterally discontinue accepting brine into EBDA’s system when <br />continued acceptance of brine is not in the best interest of EBDA. Specific conditions <br />around such discontinuation will be outlined in the agreement. <br />b) Indemnification of EBDA against liability resulting from such disposal. <br />6. LAVWMA’S Financial Participation in the EBDA System <br />6.1 Operations and Maintenance. LAVWMA shall be responsible for its share of all <br />applicable costs attributable to LAVWMA’s use of and capacity rights in the EBDA System, <br />which include OLEPS, MDF, Operations Center, and force main from OLEPS to Bay Outfall, <br />and exclude those costs specifically associated with the Union Effluent Pump Station (UEPS), <br />Hayward Effluent Pump Station (HEPS) and their associated force main sections, as well as <br />facilities owned by the City of San Leandro. The costs shall include: operations, maintenance, <br />administration, studies, reports, and renewal and replacement of equipment including equipment <br />covered by EBDA’s Renewal and Replacement Program. Certain costs shall be allocated on a <br />DocuSign Envelope ID: 2015A7A9-8BAE-4CD6-9738-D2CFBB077285