Laserfiche WebLink
5 <br />EBDA/LAVWMA Master Agreement July 1, 2021 <br />2.3 “MGD.” Million gallons per day. <br />2.4 “LAVWMA PWWF” (Peak Wet Weather Flow). The instantaneous rate of flow in <br />MGD, made up of dry weather flow plus the infiltration and inflow flows typically found as a <br />result of a precipitation event, as measured at LAVWMA’s monitoring station located <br />approximately one mile north of EBDA’s Oro Loma Effluent Pump Station (OLEPS). <br />2.5 “Treated Wastewater.” Wastewater which complies with all National Pollutant <br />Discharge Elimination System (NPDES) permit requirements imposed upon EBDA as well as <br />NPDES permit requirements imposed directly upon LAVWMA or its member agencies by any <br />regulatory agency. <br />3. Authorization to Connect to the EBDA System <br />LAVWMA is authorized by EBDA to connect its wastewater line to EBDA’s System <br />along EBDA’s force main north of OLEPS and south of the Marina Dechlorination Facility <br />(MDF) and to discharge its treated wastewater in and through the EBDA force main subject to <br />the provisions, limitations and conditions of this Amended and Restated Master Agreement. <br />4. LAVWMA’s Right of Discharge <br />4.1 General Right of Discharge. Subject to the provisions, limitations and conditions of <br />this Amended and Restated Master Agreement, LAVWMA shall have the right to discharge a <br />total of 41.2 MGD PWWF into the EBDA system, which right consists of Firm Capacity of 19.72 <br />MGD and 21.48 MGD of “Interruptible Capacity.” <br />4.2 Interruptible Capacity. LAVWMA’s “Interruptible Capacity” refers to that capacity <br />which exceeds LAVWMA’s Firm Capacity of 19.72 MGD, up to a maximum of 41.2 MGD, and <br />which is restricted by the ability of OLEPS to pump the flow from the southern portion of the <br />system (from Union, Hayward, and Oro Loma) against the flow from the northern portion of the <br />DocuSign Envelope ID: 2015A7A9-8BAE-4CD6-9738-D2CFBB077285