Laserfiche WebLink
· ". , .Z-83-160 <br /> <br />22. <br /> <br />That the site be kept free of fire hazards from the <br />start of construction to final inspection and that the <br />Fire Department emergency number be provided adjacent <br />to all telephones on the site. <br /> <br />23. That the following water conserving plumbing fixtures <br /> be installed: a) low flUsh wate~ closets; b) shower <br /> flow control heads; c) aerators in interior faucets; <br /> and d) insulation of hot water lines. <br /> <br />24. That the applicant be aware that design review approval <br /> lapses Within one year unless a building permit is <br /> issued and construction has commenced and diligently <br /> pursued toward <br /> from the City. <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />completion or an extension has been requested <br /> <br />That the developer acknowledges that the City of Pleasanton <br />does not guarantee the availability of sufficient sewer <br />capacity to serve this development by the approval of <br />this case, and that the developer agrees and acknowledges <br />that building permit approval may be withheld if sewer <br />capacity is found by the City not to be available. <br /> <br />That al! buildings and/or structures must comply with all <br />codes and ordinances in effect at the time required permits <br />are issued by the Building Division. <br /> <br />~lat the location of any pad mounted transformers shall be <br />subject to approval by the Planning Division prior to <br />issuance of a building permit. Generally speaking, such <br />transformers shall not be located between any street and the <br />front of a building. <br /> <br />That the development shall meet all requirements of the <br />Pleasanton Fire Code. <br /> <br />That the developer submit a building permit survey <br />and site development plan in accordance with the <br />Survey Ordinance (Article 3, Chapter 3, Title II) and <br />that these plans be approved by the City Engineer <br />prior to the issuance of a building permit. <br /> <br /> <br />