Laserfiche WebLink
25.77887.4500e-0030.0000 25.6417 25.6417 5.4900e-0030.00003.2000e-0047.6900e-0037.6900e-0037.4500e-00325.6417 25.6417 5.4900e-0030.0000 25.7788Total 0.0266 0.1810 0.19727.6900e-0037.6900e-0037.4500e-0037.4500e-0030.0000Category tons/yrMT/yrOff-Road 0.0266 0.1810 0.1972 3.2000e-004Bio- CO2 NBio- CO2Total CO2 CH4 N2O CO2eFugitive PM10Exhaust PM10PM10 TotalFugitive PM2.5Exhaust PM2.5PM2.5 TotalWater Exposed AreaReduce Vehicle Speed on Unpaved Roads3.2 Building Construction - 2022Unmitigated Construction On-SiteROG NOx CO SO27.30 20.00 LD_MixHDT_Mix HHDT3.1 Mitigation Measures ConstructionArchitectural Coating4 10.00 0.00 0.00 10.8010.80 7.30 20.00 LD_MixHDT_Mix HHDT7.30 20.00 LD_MixHDT_Mix HHDTPaving4 10.00 0.00 0.00Building Construction9 52.00 25.00 0.00 10.80Worker Trip LengthVendor Trip LengthHauling Trip LengthWorker Vehicle ClassVendor Vehicle ClassHauling Vehicle ClassTrips and VMTPhase Name Offroad Equipment CountWorker Trip NumberVendor Trip NumberHauling Trip NumberArchitectural Coating Forklifts 1 4.00 89 0.20Architectural Coating Cranes 1 8.00 231 0.29Architectural Coating Air Compressors 0 6.00 78 0.48Architectural Coating Aerial Lifts 2 2.00 63 0.31Appendix APage 117