Laserfiche WebLink
29Acres of Grading (Site Preparation Phase): 0Acres of Grading (Grading Phase): 0Acres of Paving: 0.83Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 174,093; Non-Residential Outdoor: 58,031; Striped Parking Area: 3 Architectural CoatingArchitectural Coating 5/25/2022 7/4/20225362 PavingPaving5/25/2022 6/8/20225 11End Date Num Days WeekNum Days Phase Description1 Building ConstructionBuilding Construction 5/16/2022 7/4/202253.0 Construction DetailConstruction PhasePhase NumberPhase Name Phase Type Start Date0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00NBio-CO2 Total CO2 CH4 N20 CO2ePercent Reduction0.00 0.00 0.00 0.00Exhaust PM10PM10 TotalFugitive PM2.5Exhaust PM2.5PM2.5 TotalBio- CO2ROG NOx CO SO2 Fugitive PM100.0000 4,347.59104,347.5910 0.8890 0.0000 4,369.81660.7609 0.9126 1.6734 0.2057 0.8608 1.0664Maximum 45.1727 22.5616 21.9361 0.04590.0000 4,347.59104,347.5910 0.8890 0.0000 4,369.81660.7609 0.9126 1.6734 0.2057 0.8608 1.06642022 45.1727 22.5616 21.9361 0.0459Total CO2 CH4 N2O CO2eYear lb/daylb/dayPM10 TotalFugitive PM2.5Exhaust PM2.5PM2.5 TotalBio- CO2 NBio- CO2Mitigated ConstructionROG NOx CO SO2 Fugitive PM10Exhaust PM10Appendix APage 137