My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />98 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Management Agency is 11.5 miles southwest of the project site.78 Therefore, the proposed project is <br />not at risk of inundation from a tsunami or seiche. The proposed project is not likely to result in <br />impacts because there is a low risk of flooding, tsunami, and seiche at the project site and the site is <br />therefore not at risk of inundation. Therefore, the proposed project would not result in the release <br />of pollutants due to project inundation. There would be no impacts. <br />e) Conflict with or obstruct implementation of a water quality control plan or sustainable <br />groundwater management plan? <br />No impact. Because project construction would disturb more than 1 acre of land, the proposed <br />project would be required to comply with the terms of the Construction General Permit, which <br />require the preparation and implementation of a SWPPP and associated BMPs to minimize the risk <br />of pollutants from construction activities entering surface waters or groundwater basins. Therefore, <br />the proposed project would not conflict with or obstruct a water quality control plan or groundwater <br />management plan. There would be no impacts. <br />Mitigation Measures <br />None required. <br /> <br />78 California Emergency Management Agency. 2009. Tsunami Inundation map for Emergency Planning – Newark Quadrangle, Redwood <br />Point Quadrangle. July 31. Website: https://www.conservation.ca.gov/cgs/Documents/Publications/Tsunami- <br />Maps/Tsunami_Inundation_NewarkRedwoodPoint_Quads_Alameda.pdf. Accessed February 2, 2021.
The URL can be used to link to this page
Your browser does not support the video tag.