Laserfiche WebLink
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />98 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Management Agency is 11.5 miles southwest of the project site.78 Therefore, the proposed project is <br />not at risk of inundation from a tsunami or seiche. The proposed project is not likely to result in <br />impacts because there is a low risk of flooding, tsunami, and seiche at the project site and the site is <br />therefore not at risk of inundation. Therefore, the proposed project would not result in the release <br />of pollutants due to project inundation. There would be no impacts. <br />e) Conflict with or obstruct implementation of a water quality control plan or sustainable <br />groundwater management plan? <br />No impact. Because project construction would disturb more than 1 acre of land, the proposed <br />project would be required to comply with the terms of the Construction General Permit, which <br />require the preparation and implementation of a SWPPP and associated BMPs to minimize the risk <br />of pollutants from construction activities entering surface waters or groundwater basins. Therefore, <br />the proposed project would not conflict with or obstruct a water quality control plan or groundwater <br />management plan. There would be no impacts. <br />Mitigation Measures <br />None required. <br /> <br />78 California Emergency Management Agency. 2009. Tsunami Inundation map for Emergency Planning – Newark Quadrangle, Redwood <br />Point Quadrangle. July 31. Website: https://www.conservation.ca.gov/cgs/Documents/Publications/Tsunami- <br />Maps/Tsunami_Inundation_NewarkRedwoodPoint_Quads_Alameda.pdf. Accessed February 2, 2021.