Laserfiche WebLink
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />118 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />the proposed project would be consistent with the planned growth as estimated by ABAG. <br />Furthermore, the operations of the proposed project would create more employment opportunities <br />for the area and would improve the City’s job to housing ratio. As such, the project’s temporary and <br />permanent employment requirements could be met by the region’s existing labor force without <br />substantial numbers of people needing to relocate into the project region. Because the proposed <br />project would not displace substantial numbers of people or induce substantial unplanned <br />population growth in the area or region, impacts would be less than significant. <br />b) Displace substantial numbers of existing people or housing, necessitating the construction of <br />replacement housing elsewhere? <br />No impact. The project site is currently developed with a surface-paved parking lot and landscaping. <br />There are no residential housing units on the project site, and the proposed project would not <br />include the removal of existing housing units. Therefore, no existing residents would be displaced by <br />the proposed project, and no impact would occur. <br />Mitigation Measures <br />None required.