My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 125 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Environmental Issues <br />Potentially <br />Significant <br />Impact <br />Less than <br />Significant <br />Impact with <br />Mitigation <br />Incorporated <br />Less than <br />Significant <br />Impact <br />No <br />Impact <br />2.17 Transportation <br />Would the project: <br />a) Conflict with a program plan, ordinance or <br />policy of the circulation system, including <br />transit, roadway, bicycle and pedestrian <br />facilities? <br /> <br />b) Would the project conflict or be inconsistent <br />with CEQA Guidelines Section 15064.3, <br />subdivision (b)? <br /> <br />c) Substantially increase hazards due to a <br />geometric design feature (e.g., sharp curves or <br />dangerous intersections) or incompatible uses <br />(e.g., farm equipment)? <br /> <br />d) Result in inadequate emergency access? <br /> <br />Environmental Evaluation <br />Setting <br />The information in this section is based, in part, on the 10x Genomics TIA Report prepared by Fehr & <br />Peers dated March 2021 which is included as Appendix J of this document. The following is a <br />summary of the results of the TIA prepared for the proposed project. <br />Potential project impacts on the transportation network were evaluated based on the City of <br />Pleasanton’s standards of significance and the Governor’s Office of Planning and Research (OPR) <br />recommendations for VMT impacts (The City of Pleasanton has yet to develop VMT guidelines). <br />These include assessments of the project’s effects on VMT, pedestrian facilities, transit services, <br />bicycle facilities, potential hazards, and emergency vehicle access. In addition, intersection Levels of <br />Service (LOS) were calculated to assess the proposed project’s consistency with City General Plan <br />operational thresholds. This was determined by measuring the effect Project traffic would have on <br />16 intersections in the vicinity of the site during the morning (7:00 a.m. to 9:00 a.m.) and evening <br />(4:00 p.m. to 6:00 p.m.) peak periods. Conditions were evaluated under Existing, Near-term and <br />Cumulative conditions without and with the Project. Operations of intersections internal to the site <br />were also evaluated and lane configuration and traffic control recommendations were developed. <br />To assess the project’s consistency with the City’s General Plan policies, level of service and queuing <br />assessments were undertaken. These analyses identified several inconsistencies with General Plan <br />policies. However, the proposed project would not degrade an intersection beyond established level <br />of service standards that was operating within the level of service standards prior to the addition of <br />project traffic. In addition to paying all local and regional transportation impact fees, the proposed <br />project would be required to construct improvements at the intersections of Stoneridge Drive at
The URL can be used to link to this page
Your browser does not support the video tag.