My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 127 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />reprogramming of the traffic signal at Springdale Avenue at Stoneridge Drive to provide conditional <br />southbound left-turn phasing which could serve the southbound left-turn movement twice per cycle <br />during the PM peak hour; however, these timings would need to consider the eastbound through <br />movement queue on eastbound Stoneridge Drive extending from Stoneridge Mall Road. <br />Implementation of the improved southbound left turn phasing would necessitate modifications to <br />the geometry and median on the south leg of the intersection to allow for concurrent northbound <br />and southbound left turns. Operations at this intersection would be required to be monitored <br />between project Phases 1 and 2 to determine the appropriate level of signal timing modifications <br />and improvements necessary to eliminate queue overflow issues. Additionally, the Applicant would <br />be required to contribute fair share funding towards improvements under construction at Stoneridge <br />Drive and Stoneridge Mall Road intersection to extend the southbound left turn storage.104 <br />Implementation of MM TRANS-1 and TRANS-2 would reduce potential queueing impacts to less than <br />significant. <br />Pedestrian access is currently provided on Springdale Avenue and Stoneridge Drive. No pedestrian <br />facilities are proposed to be removed as a part of the development, and new pedestrian facilities <br />would be constructed. The proposed project would construct pedestrian access to all off-site public <br />sidewalks. Existing sidewalks and off-site pedestrian facilities are proposed to remain in place. The <br />proposed project would not create any inconsistencies with adopted pedestrian system plans, <br />guidelines, or standards. Bus stops are currently located on Stoneridge Mall Road and Springdale <br />Avenue. Pedestrian connections would be provided from the site to the bus stops.105 <br />Existing Class 2 bicycle facilities are provided in the immediate vicinity of the project site on Foothill <br />Road and Stoneridge Drive, except for the westbound direction of travel along the project frontage. <br />The project does not propose to eliminate existing bicycle facilities in the vicinity of site. The Bicycle <br />and Pedestrian Master Plan proposes changes to Bicycle facilities on Stoneridge Drive and <br />Stoneridge Mall Road. The proposed project would include construction of planned bicycle facilities <br />along the project frontage and would not interfere with any planned bicycle facilities in the area. The <br />proposed project does not create any inconsistencies with the adopted bicycle system plans, <br />guidelines, policies or standards.106 Furthermore, MM TRANS-3 would require the Applicant to <br />coordinate with the City of Pleasanton to develop a bicycle facility concept for Stoneridge Drive <br />between the I-680 southbound ramps and Foothill Road that considers intersection treatments and <br />access to bicycle facilities on Stoneridge Mall Road that would connect to the BART station. The <br />Applicant would be required to construct the identified improvements along the project frontage <br />and at the intersections of Springdale Avenue and Stoneridge Mall Road. This concept would be <br />required to be consistent with the 2018 City of Pleasanton Bicycle and Pedestrian Master Plan, which <br />identified construction of buffered bike lanes in the near-term and separated bikeways in the long- <br />term. To the extent feasible, the long-term improvements shall be constructed along the project <br />frontage. Furthermore, the Applicant would be required to contribute to the construction of a Class <br />IV facility on the eastside of Stoneridge Mall Road connecting Stoneridge Drive to the West <br />Pleasanton BART Station. The Applicant would be required to construct bicycle and pedestrian <br /> <br />104 Ibid. <br />105 Fehr & Peers. 2021. 10x Genomics Transportation Impact Analysis Report. February. <br />106 Ibid.
The URL can be used to link to this page
Your browser does not support the video tag.