My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton 10x Genomics Project Mitigation Monitoring and Reporting Program FirstCarbon Solutions 3 https://adecinnovations.sharepoint.com/sites/ESSite/Shared Documents/ES/Active Projects/2148 City of Pleasanton/0024 10x Genomics/DOCUMENTS/01‐ ISMND/05 ‐ MMRP/21480024 10x Genomics MMRP.docx Table 1: 10x Genomics Project Mitigation Monitoring and Reporting Program Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial 2.3 Air Quality MM AIR‐1: Implement BAAQMD Best Management Practices During Construction The following Best Management Practices (BMP), as recommended by the Bay Area Air Quality Management District (BAAQMD), shall be implemented during construction: All active construction areas should be watered at least two times per day. All exposed non‐paved surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and access roads) shall be watered at least three times per day and/or non‐toxic soil stabilizers should be applied to exposed non‐paved surfaces. All haul trucks transporting soil, sand, or other loose material off‐site shall be covered and/or should maintain at least 2 feet of freeboard. All visible mud or dirt track‐out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. All vehicle speeds on unpaved roads shall be limited to 15 miles per hour. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads should be laid as soon as possible after grading unless seeding or soil binders are used. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of Review notes on construction plan; conduct site inspection During construction activities City of Pleasanton, BAAQMD
The URL can be used to link to this page
Your browser does not support the video tag.