My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton 10x Genomics Project Mitigation Monitoring and Reporting Program FirstCarbon Solutions 6 https://adecinnovations.sharepoint.com/sites/ESSite/Shared Documents/ES/Active Projects/2148 City of Pleasanton/0024 10x Genomics/DOCUMENTS/01‐ ISMND/05 ‐ MMRP/21480024 10x Genomics MMRP.docx Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial cover). No grading, excavation, construction or storage of materials shall occur within that zone. 3. Underground services including utilities, sub‐drains, water or sewer shall be routed around the Tree Protection Zone. Where encroachment cannot be avoided, special construction techniques such as hand digging or tunneling under roots shall be employed where necessary to minimize root injury. 4. Tree Preservation Notes, prepared by the Consulting Arborist, should be included on all relevant plans. 5. Any herbicides placed under paving materials must be safe for use around trees and labeled for that use. 6. Irrigation systems must be designed so that no trenching will occur within the Tree Protection Zones. 7. Maintain the existing irrigation system. If the existing irrigation system is not functional, have a temporary system installed (using soaker hoses or PVC pipe laid on the ground and covered with mulch) as soon as possible to supply the trees with water and help them recover and prepare them for impacts associated with the construction process. Pre‐construction Treatments 1. The contractor and construction superintendent shall meet with the Consulting Arborist before beginning work to discuss work procedures and tree protection. 2. Fence all trees to be retained to completely enclose the Tree Protection Zone prior to grubbing or grading. Fences shall be 6‐foot chain link or equivalent as approved by Consulting Arborist. Fences are to remain until all grading, construction and landscaping is completed. Place weatherproof signs, 2 feet by 2 feet, on the fencing that read “Tree Protection Zone Keep Out” (e.g., one sign for each of the four compass points). 3. Where possible, cap and abandon all existing underground
The URL can be used to link to this page
Your browser does not support the video tag.