My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–10x Genomics Project <br />Final Initial Study/Mitigated Negative Declaration Responses to Written Comments <br /> <br /> <br />FirstCarbon Solutions 2-5 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/Final ISMND/21480024 Sec02-00 Responses to Comments.docx <br />Local Agencies <br />Bay Area Air Quality Management District (BAAQMD) <br />Response to BAAQMD-1 <br />Comment noted. Although the applicant is not required to implement all the Transportation Demand <br />Management (TDM) measures as suggested by the BAAQMD in this comment, the proposed project <br />would include the following TDM measures outlined below that would reduce mobile emissions to <br />below a level of significance: <br />• Secure bicycle parking, <br />• Safe and convenient pedestrian and bicyclist access to streets, sidewalks, bike paths, and <br />public transit stops, <br />• Electric Vehicle (EV) chargers per Building Code requirements (see Response to BAAQMD-3 <br />below), <br />• Solar ready. <br /> <br />Response to BAAQMD-2 <br />The City’s Zoning Ordinance defines parking requirements of the development. The project site <br />would be rezoned to Planned Unit Development (PUD) Commercial-Office (PUD-C-O) and would <br />provide less than one parking space for each employee. The project does not propose parking in <br />excess of the parking requirements set forth by the City, as discussed in Section 2.3, Air Quality, of <br />the Draft IS/MND. Furthermore, the applicant is not required by the City to reduce the number of <br />parking spaces proposed by the project or to provide fewer than the required number of spaces <br />according to the City’s Zoning Ordinance. In addition, there is a pre-existing parking agreement <br />between the owners of the adjacent Stoneridge Mall and the owners of the project site. The <br />agreement previously required a parking ratio of four spaces per 1,000 square feet. The applicant <br />and Stoneridge Mall owners have negotiated a new agreement to provide a reduced parking ratio of <br />3.3 spaces per 1,000 square feet at full buildout of the proposed project. Therefore, the parking <br />requirements have already been reduced, and the proposed project adheres to the private <br />agreement. No further analysis is warranted. <br />Response to BAAQMD-3 <br />The proposed project would include EV-ready infrastructure in accordance with Building Code <br />requirements. The number of EV-ready spaces that would be provided would comply with the <br />requirements contained in Title 24, Part 11 of the 2019 California Building Code. Additionally, while <br />the proposed project does not show EV parking spaces in the Illustrative Site Plan used for the basis <br />of the analysis provided in the Draft IS/MND, the proposed project would be required to provide <br />priority parking facilities for these types of vehicles, in accordance with Section 11.36.230 and <br />Section 20.70.050 of the Pleasanton Municipal Code. Furthermore, the proposed project would <br />comply with the California Green Building Code, which requires non-residential projects to include 6 <br />percent of parking as EV capable. Therefore, no further analysis is warranted. <br />Response to BAAQMD-4 <br />Comment noted. As the comment suggests, the applicant will contact the BAAQMD upon permitting <br />of their stationary source equipment.
The URL can be used to link to this page
Your browser does not support the video tag.