Laserfiche WebLink
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 77 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Table 13: Construction Greenhouse Gas Emissions <br />Construction Phase MT CO2e per year <br />Project Phase 1 <br />Site Preparation 2021 47 <br />Grading 2021 96 <br />Building Construction 2021 219 <br />Paving 2021 13 <br />Architectural Coating 2021 34 <br />Project Phase 1 Total 410 <br />Project Phase 2 <br />Pavement removal 2021 177 <br />Building Construction 2021 35 <br />Building Construction 2022 221 <br />Paving 2022 15 <br />Architectural Coating 2022 40 <br />Project Phase 2 Total 488 <br />Project Phase 3 <br />Building Construction 2022 44 <br />Paving 2022 5 <br />Architectural Coating 2022 10 <br />Project Phase 3 Total 59 <br />Total Construction Emissions 957 <br />Emissions Amortized Over 30 Years1 32 <br />Notes: <br />MT CO2e = metric tons of carbon dioxide equivalent <br />1 Construction GHG emissions are amortized over the 30-year lifetime of the project. Totals <br />may not add up due to rounding. <br />Source: CalEEMod Output (Appendix A). <br /> <br />As shown in Table 13, the proposed project's construction is estimated to generate a total of <br />approximately 957 MT CO2e. As discussed above, the GHG emissions generated during the <br />construction of the proposed project were amortized over the proposed development's 30-year <br />lifetime and added to the estimated annual GHG emissions during project operation. <br />Project Operation <br />Operational or long-term emissions occur over the life of the proposed project. The major sources <br />for operational GHG emissions include: <br />1. Motor Vehicles: These emissions refer to GHG emissions contained in the exhaust from the <br />cars and trucks that would travel to and from the project site. Vehicle trips associated with <br />project operations would primarily include visitor trips to and from the proposed project. Trip