My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />80 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Table 15: Consistency with Pleasanton General Plan GHG Reduction Measures <br />General Plan Program 6.3 BMPs Project Consistency <br />BMP No. 1. Single- and multi-family residential <br />and commercial development to comply with the <br />City of Pleasanton’s Green Building Ordinance. <br />Consistent. The proposed project would be required <br />to comply with all applicable municipal codes and <br />ordinance governing the design and implementation <br />of the proposed project. <br />BMP No. 2. Development shall incorporate energy <br />efficient appliances and systems that meet Energy <br />Star standards. <br />Inconsistent. The proposed project would not <br />explicitly include appliances or building features and <br />mechanical components which would be Energy Star® <br />certified. However, MM GHG-1 requires that the <br />project Applicant include Energy Star® appliances in <br />the proposed project. Incorporation of MM GHG-1 <br />would ensure that the proposed project is consistent <br />with this BMP. <br />BMP No. 3. Where feasible, incorporate solar <br />roofs (or other alternative energy measures) into <br />commercial development sufficient to meet 12.5 <br />percent of the building’s annual energy usage. <br />Calculations of energy saving may be prepared at <br />the construction drawing stage. <br />No Conflict. The proposed project would possibly <br />include solar panels or the use of renewable or <br />alternative energy sources to serve the project <br />building’s energy needs. Additionally, the proposed <br />project is not designed in a way that would prevent its <br />potential use of on-site solar energy generation or the <br />use of other alternative energy generation sources. As <br />the proposed project would not result in GHG <br />emissions which exceed BAAQMD thresholds of <br />significance, as displayed in Table 14, the proposed <br />project would not conflict with this BMP. <br />BMP No. 4. Require transit and bicycle/pedestrian <br />connections in new development, where feasible. <br />Consistent. The proposed project would include <br />pedestrian or mixed use pathways throughout and <br />along the perimeter of the project site. Any passerby <br />or future project employee would be able to access <br />these pathways and connect to adjacent sidewalks and <br />bicycle/pedestrian facilities. The proposed project <br />would be consistent with this measure. <br />BMP No. 5. For commercial/industrial projects, <br />prepare and implement a voluntary Trip <br />Reduction Plan, using the resources available <br />through the City of Pleasanton’s Transportation <br />Systems Management program as described in <br />Chapter 17.24 of the Pleasanton Municipal Code. <br />Trip reduction goal of 15 percent within five years <br />and 25 percent within 10 years, compared to <br />“business as usual.” <br />No Conflict. While the proposed project would not <br />explicitly include a Trip Reduction Plan, this is a <br />voluntary measure as provided in Chapter 17.24 of the <br />Pleasanton Municipal Code. Nonetheless, the <br />proposed project would not conflict with or obstruct <br />the implementation of this measure or preclude the <br />later implementation of this measure with the <br />proposed project. Therefore, the proposed project <br />would not conflict with this measure. <br />BMP No. 6. Require priority facilities for <br />alternative-fueled vehicles, such as priority <br />parking and recharging facilities, where feasible. <br />No Conflict. While the proposed project does not <br />designate EV charging stations or priority parking <br />spaces for EVs or other alternative-fueled vehicles in <br />the Illustrative Site Plan used for the basis of this <br />analysis, dated December 18, 2020, the proposed <br />project would be required to provide priority parking <br />facilities for these types of vehicles, as described in <br />Sections 11.36.230 and 20.70.050 of the Pleasanton <br />Municipal Code. In addition, the proposed project <br />would be required to comply with the California Green <br />Building Code, which requires non-residential projects <br />to include 6 percent of parking as EV capable.
The URL can be used to link to this page
Your browser does not support the video tag.