My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />82 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Applicable Goals and Supporting Actions Project Consistency <br />Building Standards Code. Include new requirements for <br />shade trees, cool roofs, and landscape lighting. Achieve <br />25% beyond Title 24. <br />Emissions related to electricity consumption by <br />the proposed project would be further reduced <br />as the electric utility complies with the <br />Renewable Portfolio Standard, which requires <br />utilities to increase its mix of renewable energy <br />sources to 33 percent by 2020 and eventually <br />100 percent carbon-free by 2045. Additionally, <br />the proposed project would comply with the <br />California Green Building Standards Code, which <br />includes requirements to increase recycling, <br />reduce waste, reduce water use, increase bicycle <br />use, solar panels, and other measures that will <br />reduce greenhouse gas emissions. <br />Supporting Action EC1-3: Modify municipal code to <br />reduce heat island effects in the City by requiring light- <br />colored paving material for roads and parking areas, as <br />well as parking lot shade trees. <br />Land Use and Transportation <br />Goal 2: Improve Transit Systems and Ridership Consistent. Transit service in the project area is <br />provided by Wheels, Pleasanton Paratransit and <br />Bay Area Rapid Transit (BART). Continuous <br />pedestrian connections are provided along the <br />perimeter of the project site except for along <br />Stoneridge Mall Road. The closest transit stop to <br />the project site is near the intersection of <br />Stoneridge Mall Road and McWillliams Lane, <br />approximately 100 feet from the project site; <br />therefore, it is expected that a portion of future <br />project employees would use existing nearby <br />transit facilities. Moreover, for employees who <br />will principally drive to the proposed project, <br />motor vehicle emissions associated with the <br />proposed project would be reduced through <br />compliance with state regulations on fuel <br />efficiency and fuel carbon content. The <br />regulations include the Pavley fuel efficiency <br />standards that require manufacturers to meet <br />increasing stringent fuel mileage rates for <br />vehicles sold in California and the Low Carbon <br />Fuel Standard that requires reductions in the <br />average carbon content of motor vehicle fuels. <br />Considering this information, the proposed <br />project would not conflict with the City’s goals <br />and strategies aimed to increase non-motorized <br />mobility, improve transportation demand <br />management, increase motor vehicle efficiency, <br />or other goals aimed to reduce GHG emissions <br />from transportation. <br />Goal 3: Increase Non-motorized Mobility <br />Supporting Action NM 1-1: Require appropriate bicycle- <br />related improvements (i.e., work-place provision for <br />showers, bicycle storage, bicycle lanes, etc.) with new <br />development. <br />Supporting Action NM 1-18: Preserve rights-of-way <br />needed for local and regional roadway “complete streets” <br />improvements and increased connectivity through <br />dedication of land, as adjacent properties develop. <br />Supporting Action NM 1-19: Modify municipal <br />development codes to develop complete street standards <br />to maximize transportation opportunities that serve all <br />mobility modes. <br />Goal 4: Improve Transportation Demand Management <br />Goal 5: Increase Motor Vehicle Efficiency <br />Solid Waste Minimization <br />SW Goal: Establish Pleasanton as a Zero Waste <br />Community by 2025 <br />Consistent. The proposed project would comply <br />with the California Green Building Standards <br />Code, which includes requirements to increase <br />recycling, reduce waste, reduce water use, Supporting Action SW 2-2: Develop community zero <br />waste plan—75% diversion by 2015; 85% diversion by
The URL can be used to link to this page
Your browser does not support the video tag.