My WebLink
|
Help
|
About
|
Sign Out
7_Exhibits A, C & D
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2021
>
07-14
>
7_Exhibits A, C & D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 3:26:25 PM
Creation date
7/7/2021 3:26:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/14/2021
DESTRUCT DATE
15Y
Document Relationships
7
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\07-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
treatment controls that will be installed. Full trash capture devices shall be a part of the <br /> "Stormwater Treatment Measures and Maintenance Agreement." (Address this condition <br /> prior to Occupancy Permit issuance.) <br /> FIRE DEPARTMENT — 925-454-2361 <br /> The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and <br /> fire hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation <br /> of the on-site fire mains and fire hydrants. Specific installation drawings submitted by the <br /> licensed underground fire protection contractor shall be submitted to the Fire Prevention Bureau <br /> for approval; and 2.) Backflow prevention or connections to the public water mains. <br /> 87. DEFENSIBLE SPACE: Provide 100 feet of defensible space from the proposed structure <br /> in accordance with CFC section 4907. (Project Specific Condition) <br /> 88. FUEL BREAK: Provide a 20-foot shaded fuel break along the north and east fire lane. <br /> (Project Specific Condition) <br /> 89. EMERGENCY RADIO COVERAGE: Emergency responder radio coverage is required in <br /> accordance with section 510 of the fire code. (Project Specific Condition) <br /> 90. SPRINKLERS: A sprinkler system is required in accordance with section 903 of the fire <br /> code with local ordinances. (Project Specific Condition) <br /> 91 . STANDPIPES: A standpipe system is required in accordance with section 905 of the fire <br /> code (as applicable). (Project Specific Condition) <br /> 92. FIRE FLOW: Fire flow shall be in accordance with appendix B of the fire code with a 50 <br /> percent reduction for sprinklers. (Project Specific Condition) <br /> 93. FIRE HAZARDS: The project developer shall keep the site free of fire hazards from the <br /> start of lumber construction until the final inspection. <br /> 94. FIRE PROTECTION FACILITIES: Prior to any construction framing, the applicant shall <br /> provide adequate fire protection facilities, including, but not limited to a water supply and <br /> water flow in conformance to the City's Fire Department Standards able to suppress a <br /> major fire. <br /> 95. WATER FLOW AND CONTROL VALVES: All fire sprinkler system water flow and control <br /> valves shall be complete and serviceable prior to final inspection. Prior to the occupancy <br /> of a building having a fire alarm system, the Fire Department shall test and witness the <br /> operation of the fire alarm system. <br /> 96. ELECTRICAL CONDUIT: Electrical conduit shall be provided to each fire protection <br /> system control valve including all valve(s) at the water connections. The Livermore- <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 17 of 25 <br />ct to the review <br /> and approval of the Director of Engineering/City Engineer. Stormwater treatment controls, <br /> proposed in compliance with Provision C.3 of NPDES Permit No. CAS612008, shall also <br /> prevent the discharge of trash to the downstream municipal separate storm sewer <br /> systems and receiving waters. Discharge points from these treatment control facilities, <br /> including overflows, shall be appropriately screened (5 mm mesh screen) or otherwise <br /> configured to meet the full trash capture screening specification for storm flows up to the <br /> full trash capture 1-year, 1-hour storm hydraulic specification, in compliance with the <br /> NPDES Permit No. CAS612008. The applicant shall submit a Stormwater Management <br /> Plan as part of the improvement plans prepared by a California licensed civil engineer, <br /> which include but is not limited to the type, location, and sizing calculations of the <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 16 of 25 <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 3 of 25 <br />YCROSSCRISFIELD .*- 4-; -,47÷-'' 1.1--1 ''.-. HAM <br /> ;-----fk;s7,4G <br /> il <br /> 3` <br /> • kst • .7 <br /> I DIJNIYA1:1%, ..4.. ,i4is' '1 , „J 10 ,,,... <br /> ‘1 'kTIAV - 1) \ ‘ ' ?) $.Y \t, ,2:2/ <br /> \ ‘ 111-,-,: . <br /> ,..... i ..., i <br /> 1:11,343 <br /> o 0.125 0.25 mi PUD-140, Townsend, Lot Line, 2207 Martin Ave Planning Division =-- -.• .-.... , 1:16 <br /> I i II May 10,2021 FLEA:.,ANTON. <br /> 0 650 1,300 Feet <br />