My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
101921
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 2:18:54 PM
Creation date
10/13/2021 2:14:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/19/2021
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
single-family and multi -family residences were addressed annually (see Table A-13). The impact <br />of these efforts on housing safety and maintaining decent housing conditions is significant even <br />if only few issues are address every year. <br />C.2.4 Permits and Procedures <br />Permits and Procedures <br />The intent of Pleasanton's development review process is to ensure a comprehensive, inclusive <br />process in the least practical amount of time. It is the City's experience that processes which <br />actively encourage citizen participation and input into new development projects have a higher <br />likelihood of approval without risk of legal challenge that further delays project implementation. <br />The time required to process a project varies from one entitlement to another and is directly <br />related to the size and complexity of the proposal, as well as the number of actions or approvals <br />needed to complete the process. Table C-8 identifies approvals and/or permits that could be <br />required for residential planning entitlements, their corresponding approval body, and the typical <br />or estimated approval timeline. It should be noted that every project would not have to obtain each <br />permit/approval, and the City frequently process related approvals (e.g., a Conditional Use Permit <br />and Design Review), concurrently. <br />Table C-8: Typical Approval Timelines <br />Permit/Approval.. <br />. <br />Design Review — Staff <br />Zoning Administrator <br />6 weeks <br />Design Review — Planning Commission <br />Planning Commission <br />8 weeks <br />Conditional Use Permit <br />Planning Commission <br />8 weeks <br />Planned Unit Development (PUD) <br />City Council <br />6 months2 <br />Note: All other permit/approvals are assumed to be subject to a Mitigated Negative Declaration/Negative Declaration or lower - <br />level environmental review. <br />1 Typical approval timeline after a project is deemed complete; applicant work periods or delays would lengthen these timelines. <br />2 For projects that do not require major legislative action such as annexation or are located outside of the City's Urban Growth <br />Boundary. <br />Source: City of Pleasanton Zoning Ordinance, City of Pleasanton <br />While the City uses both conventional zoning and PUDs, most new housing developments are <br />processed under the PUD procedure, either at the request of the applicant or as required by the <br />Zoning Ordinance (e.g., PUD, MU -T and MU -D zoning districts). Development in conventional <br />zoning districts requires only design review and possibly conditional use permit approval (see <br />Table C-6). <br />In some cases, where new development is proposed for large, undeveloped or underdeveloped <br />areas with a variety of property owners and potential infrastructure coordination issues and/or <br />environmental sensitivity, the City uses the specific plan process for the area. The specific plan <br />C-26 I City of Pleasanton Housing Constraints <br />
The URL can be used to link to this page
Your browser does not support the video tag.