Laserfiche WebLink
Section 3. That the work of constructing the underpass will <br />not begin until the City shall have given notice in writing to the <br />Division Superintendents of the Western Pacific at Stockton, Cali- <br />fornia, and the Southern Pacific at Oakland. The notices shall state <br />the time that operations for the construction of the underpass shall <br />begin. The construction of the underpass shall be performed and <br />effected in such a manner as to interfere as little as possible with <br />the safe and timely operation of locomotives, trains and cars of the <br />Railroads over their tracks at the crossing. <br />Section 4. Upon completion of construction, City, at its <br />expense, shall maintain those portions of said underpass structure <br />beneath the bridge seats or bearings, including piles, footings, <br />piers, abutments and bulkheads, and shall maintain all roadway <br />approaches, lighting, drainage, pumping installations, landscaping, <br />and any other street or highway facilities. Railroads, at their <br />expense, shall maintain Railroads' tracks, roadbed, railroad <br />drainage, those portions of the underpass structure above the <br />bottom surface of bridge bearings, and all other Railroad appurte- <br />nances. <br />Section 5. That if Railroads shall deem it necessary or <br />desirable in the future, in the performance of their duties as <br />common carriers, to raise or lower the grade or change the alignment <br />of their tracks, or to lay additional track or tracks, or to build <br />other facilities in connection with the operation of the railroads, <br />they shall have full right to make such changes or additions. <br />15 <br />