My WebLink
|
Help
|
About
|
Sign Out
SOUTHERN PACIFIC - FT 079229
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SOUTHERN PACIFIC - FT 079229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 1:56:24 PM
Creation date
11/4/2021 1:47:42 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
10/28/1986
LONG TERM AGREEMENTS - NAME
SOUTHERN PACIFIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� <br />with Stage 2 will contain steel conduit in <br />to accommodate fiber optic cable of a size <br />SPTCo in its reasonable discretion, which <br />less than eight inches inside diameter nor <br />inches inside diameter. The conduit shall <br />thirty-six inches (3611) below grade or as <br />reasonably specified by SPTCo. <br />6. Shoofly Modification. <br />Parcel A-2 of size <br />to be specified by <br />size shall not be <br />more than ten <br />be placed <br />otherwise <br />a. Immediately upon execution of this agreement by all <br />parties, railroads will cooperatively initiate design of a <br />shoofly modification to the existing shoofly alignment as <br />shown on Exhibit A. The modified shoofly design will move <br />the westerly end of the existing shoofly to reconnect with <br />the WPRR mainline approximately as shown on Exhibit A. <br />b. Railroads will complete construction of the <br />modified shoofly by May 1, 1986 or ninety (90) days from the <br />date that all three grade separation structures (Bernal, Del <br />Valle and Verona) are completed and ready for reinstallation <br />of rails, whichever comes later. <br />C. WPRR will be responsible for constructing those <br />portions of the modified shoofly within WPRR right of way and <br />SPTCo will be responsible for constructing those portions of <br />the modified shoofly within SPTCo right of way or upon the <br />Madden parcel. City will be responsible for obtaining a <br />right of entry for any work required on the Madden parcel, if <br />required. <br />d. City will pay fifty percent (50%) of the cost of <br />the shoofly modification. City contribution shall be <br />prorated between the parties based upon their respective <br />percentage contributions to the actual construction cost of <br />shoofly modification. <br />7. Tail Track. The design for the structure and the <br />structure as built in Stage 1, shall be adequate to sustain and <br />shall provide sufficient width for SPTCo's tail track to be <br />included in the bridge structure, spaced at least 16 feet <br />centerline to centerline, and shall fully comply with clearance, <br />walkway and other requirements of applicable general orders or <br />other orders of the California Public Utilities Commission which <br />said commission has issued or may have issued prior to <br />construction. As part of Stage 1 and at no cost to SPTCo, WPRR <br />will grant a twenty-three foot (231) wide easement upon and along <br />the southerly side of its mainline right-of-way for placement of <br />the relocated SPTCo tail track, as more particularly shown on <br />Exhibit A. Thereafter SPTCo shall be responsible for all costs <br />related to relocation of the SPTCo tail track and shall commence <br />relocation of the tail track no later than 100 calendar days <br />after receipt of written notice from City of completion of Stage <br />1 and shall complete such relocation within 200 calendar days <br />after receipt of such notice. City shall notify SPTCo of the <br />- 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.