My WebLink
|
Help
|
About
|
Sign Out
SOUTHERN PACIFIC - FT 079229
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SOUTHERN PACIFIC - FT 079229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 1:56:24 PM
Creation date
11/4/2021 1:47:42 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
10/28/1986
LONG TERM AGREEMENTS - NAME
SOUTHERN PACIFIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~` 1 <br />♦ C �� � A' l <br />`1 <br />1 <br />thereto, all cuts, fills, highway pavement, curbs and gutters, <br />sidewalks, guard rail, drainage facilities, slope planting, <br />buffer planting, retaining walls, street lighting, canal construc- <br />tion, necessary track work, changes to telegraph, telephone, <br />signal and electrical lines and appurtenances, including, if any, <br />their temporary relocation during construction, and all other work <br />necessary to accomplish the construction of the grade separation over, <br />under, or adjacent to the Railroad's right of way. The underpass will <br />be built to accommodate two tracks as shown in Exhibit A attached <br />hereto and made a part hereof. One of the tracks will be a Western <br />Pacific mainline track and the other will be a Southern Pacific tail <br />track. The Western Pacific will have the right to use the tail track <br />under terms and conditions as provided for in that certain Joint <br />Track Agreement dated October 12, 1981, between Western Pacific and <br />Southern Pacific. <br />The railroad work on the north half of the underpass will be <br />performed by the Western Pacific and on the south half by Southern <br />Pacific. <br />The parties hereto desire to reduce to writing their understanding <br />and agreement pursuant to which the underpass is to be located, <br />constructed, used and maintained. <br />AGREEMENT: <br />NOW, THEREFORE, it is agreed as follows: <br />ARTICLE I <br />In consideration of the covenants of the City hereinafter contained, <br />Railroads agree: <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.