Laserfiche WebLink
µ. Oil eieasanzon <br />QB <br />,Nay DESCRIPTION LABOR MTERIAL MTAL <br />SALVAGE CREDIT <br />627 T.F. @ 3.46 T.F. - $ 2,169 <br />157 CWT @ 6.30 89 <br />Total Salvage $ 3,158 - $ 3,158 <br />Less City Portion 508 $ 1,$79 - $ 1,579 <br />Less Railroad Portion 508 $1,579 - $ 1,579 <br />TOTAL ESTIMATED COST OF PROJECT $ 71,920 <br />LESS CITY PORTION $ 35,960 <br />LESS RAILROAD PORTION $ 35,960 .. <br />Flagging or Roadway Watchman service performed for the City <br />or the City's Contractor, and recollectible from the City, <br />will be reported on Form 1054, "Labor Report." <br />The above figures are estimates only and subject to fluctuation. <br />in the event of an increase in the cost or amount of material <br />and labor required, the City will be billed for actual con- <br />struction costs at the current rates effective thereof. <br />