My WebLink
|
Help
|
About
|
Sign Out
SOUTHERN PACIFIC - FT 079229
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SOUTHERN PACIFIC - FT 079229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 1:56:24 PM
Creation date
11/4/2021 1:47:42 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
10/28/1986
LONG TERM AGREEMENTS - NAME
SOUTHERN PACIFIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rm u 2 3/ 76 <br />on <br />T rp <br />SOUTHERN PACIFIC CONTRACTOR'S AGREEMENT <br />RELMIS: <br />THIS AGR_E*Z,%1FNT, made this day of <br />by and between <br />a corporation, herein termed "Railroad", and <br />herein termed "Contractor"; <br />WITNESSETH: <br />SPTCo. <br />$1 19 # <br />JI <br />address: <br />1. For a period nat to extend beyond' - 1 19 0 <br />Railroad hereby permits Contractor to enter upon tne property of Railroad <br />a r- in the County <br />of State of <br />for ccnstruction of <br />2. Contractor warrants that Contractor has entered into a contract <br />wi th t <br />termed "Third Party", covering the work to be performed in <br />connection wit' - said structure at said location. <br />3. Contractor aqree*s to reimburse Railroad for all cost and ex -Dense <br />incurred by Railroad in connection with the construction or operation not <br />reculre-_i under a,.Loresaid contract between Third Party and Contractor, <br />inclucinc, but not limited to, the furnishing of such inspectors, watch- <br />men and ilaamen as Railroad deems necessary to protect its property, <br />tracks, encines, trains and cars and the operation thereof, tae installa- <br />tion an4 removal of any necessary falsework beneath the tracks of Railroad <br />and t",e restoration of Railroad's property. No vehicular crossing over <br />R-ilrcad's track shall be installed or used by Contractor without prior <br />%-:ritten oermission of Raiizoad. <br />4. Contractor shall give Railroad at least five (5) days' notice - <br />in advance of any work done upon or adjacent to Railroad's property under <br />said contract. Contractor snall notify Railroad the date said work is <br />completed, and also the date the Contractor's work is accepted by Third <br />Party. Upon completion of the work to be done upon Railroad's property <br />under said contract, Contractor shall promptly remove from Railroad's <br />prolzerty all tools, equipment and materials placed thereon by the Contrac- <br />tor and Contractor's agents. Contractor shall restore said property to <br />the same state and condition as when Contractor entered thereon and shall <br />leave said property in a clean and presentable condition. <br />3. Said work shall be performed in accordance with plans and speci- <br />ilcatLcns approved by Railroad and in such manner and at such times as <br />shall d6tlendanger or interfere with the safe operation of the tracks <br />RR -C-1 <br />PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.