Laserfiche WebLink
except for reservation of rights for existing underground utilities or <br />portions of right-of-way needed for the new separation structure. <br />PART III - GENERAL PROVISIONS, INSURANCE AND MAINTENANCE <br />1. Local agencies shall furnish, or cause to be furnished, all labor, <br />materials, tools and equipment for the construction of said Project, except <br />as herein otherwise provided. Said Project shall be constructed <br />in a manner to accommodate Railroads' tracks and in accordance with <br />plans and specifications which shall be submitted for the approval of <br />Railroads. <br />2. The following work will be performed by Railroads: <br />a. Remove existing tracks within the area of underpass construction, <br />and at the completion of the railroad underpass structures, reconnect <br />their tracks to the permanent railroad alignment over the bridges: <br />b. Install and subsequently remove the temporary track connections <br />described in Part I, para. 6, subpara. (d), above. <br />C. Make such other track changes as may be required. <br />d. Change, remove, or relocate signal and communication facilities. <br />e. Furnish such representatives, engineering inspectors, watchmen, <br />and flagmen as Railroads deem necessary to protect and safeguard property, <br />engines, and trains and cars during the construction of the Project. <br />3. Subject to the limitations set forth in Part I, para. 8, subpara. <br />d(1), local agencies shall reimburse Railroads for all cost and expense <br />incurred by Railroads in connection with the construction of said Project, <br />including but not limited to, the items listed on Exhibits G and H, <br />attached and hereby made a part hereof. The estimated amounts of the <br />cost and expense to be incurred by Railroads in connection with the <br />11 <br />